London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old July 16th 04, 06:35 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,158
Default Chiltern platform extensions

Chiltern are extending platforms at Princes Risborough, High Wycombe,
Beaconsfield, Gerrard Cross and Wembley Stadium starting this week at
Princes Risborough.

See:
http://www.chilternrailways.co.uk/pa...=168&news=true

--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Southern Metro platform extensions (was TfL grant LOROL 2 year extension) David Cantrell London Transport 24 March 12th 13 09:54 AM
oyster season extensions spammy London Transport 3 January 21st 04 12:25 AM
Ticket extensions The Only Living Boy in New Cross London Transport 0 November 24th 03 06:30 PM
East London Line Extensions Dave Arquati London Transport 25 November 23rd 03 09:43 PM
Zone extensions with Oyster? Nick Cooper 625 London Transport 41 October 13th 03 09:31 AM


All times are GMT. The time now is 02:05 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017