London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #11   Report Post  
Old December 12th 04, 10:11 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2003
Posts: 143
Default Heathrow Piccadilly Line Closure

"Bob Wood" wrote in message
...
It might be obvious but not to me. What is the advantage of having all

the
units the same way round during the closure of the loop?


Basically, the problem arises because a 73ts will *NOT* couple A to A or D
to D.

Half of the single-ended units were built to face Heathrow whilst half were
built to face Cockfosters.

For example, you can have:
114-514-314 + 315-515-115 (D to A)
203-603-403 + 404-604-204 (A to D)
888-688-889 + 301-501-101 (D to A)

You can not have:-
114-515-314 + 312-512-112 (D to D)
895-694-894 + 892-692-893 (A to A)

By having all the units facing the right way (I've no idea if this is the
plan - Steve?!), as they were built to do, it guarantees that you have a
balance of A- and D-facing units, and generally makes it easy for the depot
staff because any unit can couple to any unit.

If you have some A-facing units facing Cockfosters and some facing Heathrow,
you have a situation where you can choose two units which are otherwise
correct for a train (i.e. a cab at each end) but which cannot couple to each
other. It is much simpler for depot staff if this situation is avoided.

The problem does not arise on the Northern or Central Lines because all
units can be coupled to each other. The reason this is not done on all stock
is because it requires the electrical wiring to be duplicated through the
coupling (couplers are either left or right handed, IYSWIM), which is more
expensive and more prone to failure.

It is not simply a matter of having line maps facing the right way, though
this is a useful spin-off as far as the passenger is concerned.


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Heathrow Picadilly line closure CharlesPottins London Transport 0 January 5th 05 10:27 AM
Heathrow Piccadilly Line Closure Colin Rosenstiel London Transport 2 December 18th 04 11:24 PM
Heathrow Piccadilly Line Closure Mait001 London Transport 3 December 18th 04 10:08 PM
Piccadilly line extension to Terminal 5/Heathrow Express extension to T5 Martin Whelton London Transport 43 May 27th 04 08:40 AM
Any updates on Piccadilly Line services to Heathrow? TheOneKEA London Transport 18 February 23rd 04 05:45 AM


All times are GMT. The time now is 04:26 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017