Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
|
|||
|
|||
Heathrow Piccadilly Line Closure
"Mait001" wrote in message
... It's not the enforced closure of the line (although I fail to see how installing a set of points and associated tunnel branching can take all of 18 months) I wondered this too, given that similar jobs for the Victoria and Jubilee lines were done with closures lasting no more than a few hours. However, I understand that there are major problems with water at the site of the T5 junction, and for this reason a quite complex engineering solution is required. Install lifts or escalators at Hatton Cross for a start! It would actually be pretty cheap and easy to install lifts at HC. Perhaps this is a missed opportunity. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Heathrow Picadilly line closure | London Transport | |||
Heathrow Piccadilly Line Closure | London Transport | |||
Heathrow Piccadilly Line Closure | London Transport | |||
Piccadilly line extension to Terminal 5/Heathrow Express extension to T5 | London Transport | |||
Any updates on Piccadilly Line services to Heathrow? | London Transport |