London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #8   Report Post  
Old April 15th 05, 05:51 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2004
Posts: 235
Default Why are Silverlink Metro trains NEVER on time ?

On Thu, 14 Apr 2005 08:31:06 +0100, Marratxi wrote:

Yes, but the Bakerloo trains cannot be blamed for making Silverlink Metro
trains late arriving at Hatch End from Watford.


Not only can they be blamed for it, they might well be the cause of it.
Short of building in huge layovers at Watford (which could cause other
problems if trains run punctually), it's a fact that a train delayed on
the outward journey may already be running late before it even starts
back.
--
http://gallery120232.fotopic.net/p9683696.html
(51368 in chocolate and cream for "GWR 150" in 1985)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Ever wondered, Mass immigration. We never wanted it. So who'sresponsible for it and why? [email protected] London Transport 0 March 18th 09 07:52 PM
Silverlink Metro and Oyster Ian F. London Transport 6 June 18th 06 03:27 PM
Why can we never get anything built around here? [email protected] London Transport 6 May 27th 06 11:30 AM
TfL to get control of Silverlink Metro TravelBot London Transport News 0 March 12th 06 07:41 PM
Silverlink Metro transfers to Tfl Nov 2007 Paul Scott London Transport 65 March 3rd 06 09:34 AM


All times are GMT. The time now is 10:42 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017