Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#8
|
|||
|
|||
Why are Silverlink Metro trains NEVER on time ?
On Thu, 14 Apr 2005 08:31:06 +0100, Marratxi wrote:
Yes, but the Bakerloo trains cannot be blamed for making Silverlink Metro trains late arriving at Hatch End from Watford. Not only can they be blamed for it, they might well be the cause of it. Short of building in huge layovers at Watford (which could cause other problems if trains run punctually), it's a fact that a train delayed on the outward journey may already be running late before it even starts back. -- http://gallery120232.fotopic.net/p9683696.html (51368 in chocolate and cream for "GWR 150" in 1985) |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Ever wondered, Mass immigration. We never wanted it. So who'sresponsible for it and why? | London Transport | |||
Silverlink Metro and Oyster | London Transport | |||
Why can we never get anything built around here? | London Transport | |||
TfL to get control of Silverlink Metro | London Transport News | |||
Silverlink Metro transfers to Tfl Nov 2007 | London Transport |