Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
He (Ken Livingstone) added: "Simply bidding for the Games has brought
forward a host of transport improvements - with the East London Line extension, the new £400m ticket hall at King's Cross, and the £91m package of improvements to the North London Line all given added momentum." What are the improvements to the NLL? £91M doesn't seem to by much these days so it can't be much of an improvement. Kevin |
#2
![]() |
|||
|
|||
![]()
Maybe the NLL's forthcoming truncation east of Stratford? (Albeit
replaced by a new DLR branch.) |
#4
![]() |
|||
|
|||
![]()
What about some improvements to the South London Line? Reinstating a station
at Brixton (with platform level interchange to the main line) would be a start! -- Regards, Max B Visit me at http://www.thebattens.ndonet.com "Dave Arquati" wrote in message ... wrote: He (Ken Livingstone) added: "Simply bidding for the Games has brought forward a host of transport improvements - with the East London Line extension, the new £400m ticket hall at King's Cross, and the £91m package of improvements to the North London Line all given added momentum." What are the improvements to the NLL? £91M doesn't seem to by much these days so it can't be much of an improvement. It should be for: - signalling enhancements - improved power supply - new "resilience measures" to counter late-running freight services - I think this just means a new/reinstated freight loop - platform extensions for 6-car trains where necessary - frequency doubling to 8tph I'm not sure how they are squeezing the £91m for those measures, but that's what it's for. -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London --- avast! Antivirus: Outbound message clean. Virus Database (VPS): 0524-0, 13/06/2005 Tested on: 13/06/2005 15:57:48 avast! - copyright (c) 1988-2004 ALWIL Software. http://www.avast.com |
#5
![]() |
|||
|
|||
![]()
MaxB wrote:
What about some improvements to the South London Line? Reinstating a station at Brixton (with platform level interchange to the main line) would be a start! This is being considered as part of the second phase of the East London Line project, but it would cost an absolute fortune; the previous station on the SLL at Brixton was halfway to Loughborough Junction, and constructing new platforms at Brixton itself would be extremely difficult. It would probably cost about £70m just by itself. -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London |
#6
![]() |
|||
|
|||
![]()
And Heaven forbid that we should spend any money south of the river, after
all we have the South Circular to keep us happy (well occupied anyway)! -- Regards, Max Batten Visit me at http://www.thebattens.ndonet.com "Dave Arquati" wrote in message ... MaxB wrote: What about some improvements to the South London Line? Reinstating a station at Brixton (with platform level interchange to the main line) would be a start! This is being considered as part of the second phase of the East London Line project, but it would cost an absolute fortune; the previous station on the SLL at Brixton was halfway to Loughborough Junction, and constructing new platforms at Brixton itself would be extremely difficult. It would probably cost about £70m just by itself. -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London --- avast! Antivirus: Outbound message clean. Virus Database (VPS): 0524-0, 13/06/2005 Tested on: 13/06/2005 22:59:48 avast! - copyright (c) 1988-2004 ALWIL Software. http://www.avast.com |
#7
![]() |
|||
|
|||
![]() "MaxB" wrote in message ... What about some improvements to the South London Line? Reinstating a station at Brixton (with platform level interchange to the main line) would be a start! Regards, Max B Does anybody have comparative figures of the number of miles of commuter rail north and south of the Thames and within the M25 ? Cheerz, Baz |
#8
![]() |
|||
|
|||
![]()
I REALLY would like to know !!
Cheerz, Baz |
#9
![]() |
|||
|
|||
![]() "Marratxi" wrote in message ... "MaxB" wrote in message ... What about some improvements to the South London Line? Reinstating a station at Brixton (with platform level interchange to the main line) would be a start! Regards, Max B Does anybody have comparative figures of the number of miles of commuter rail north and south of the Thames and within the M25 ? Cheerz, Baz This is what I REALLY want to know !! I'm sure somebody, somewhere knows. Cheerz, Baz |
#10
![]() |
|||
|
|||
![]()
Who wants to go to south London any way??
Loopy "MaxB" wrote in message ... What about some improvements to the South London Line? Reinstating a station at Brixton (with platform level interchange to the main line) would be a start! -- Regards, Max B Visit me at http://www.thebattens.ndonet.com "Dave Arquati" wrote in message ... wrote: He (Ken Livingstone) added: "Simply bidding for the Games has brought forward a host of transport improvements - with the East London Line extension, the new £400m ticket hall at King's Cross, and the £91m package of improvements to the North London Line all given added momentum." What are the improvements to the NLL? £91M doesn't seem to by much these days so it can't be much of an improvement. It should be for: - signalling enhancements - improved power supply - new "resilience measures" to counter late-running freight services - I think this just means a new/reinstated freight loop - platform extensions for 6-car trains where necessary - frequency doubling to 8tph I'm not sure how they are squeezing the £91m for those measures, but that's what it's for. -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London --- avast! Antivirus: Outbound message clean. Virus Database (VPS): 0524-0, 13/06/2005 Tested on: 13/06/2005 15:57:48 avast! - copyright (c) 1988-2004 ALWIL Software. http://www.avast.com |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Oyster product pickup improvements | London Transport | |||
Leyton Station improvements | London Transport | |||
Shepherds Bush Central line station improvements | London Transport | |||
C-charge monitoring shows sustained traffic improvements | London Transport News |