London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old June 13th 05, 01:46 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2004
Posts: 157
Default Improvements to the North London Line

He (Ken Livingstone) added: "Simply bidding for the Games has brought
forward a host of transport improvements - with the East London Line
extension, the new £400m ticket hall at King's Cross, and the £91m
package of improvements to the North London Line all given added
momentum."
What are the improvements to the NLL? £91M doesn't seem to by much
these days so it can't be much of an improvement.

Kevin

  #2   Report Post  
Old June 13th 05, 02:22 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2005
Posts: 258
Default Improvements to the North London Line

Maybe the NLL's forthcoming truncation east of Stratford? (Albeit
replaced by a new DLR branch.)

  #4   Report Post  
Old June 13th 05, 02:57 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 26
Default Improvements to the North London Line

What about some improvements to the South London Line? Reinstating a station
at Brixton (with platform level interchange to the main line) would be a
start!

--
Regards,
Max B

Visit me at http://www.thebattens.ndonet.com

"Dave Arquati" wrote in message
...
wrote:
He (Ken Livingstone) added: "Simply bidding for the Games has brought
forward a host of transport improvements - with the East London Line
extension, the new £400m ticket hall at King's Cross, and the £91m
package of improvements to the North London Line all given added
momentum."
What are the improvements to the NLL? £91M doesn't seem to by much
these days so it can't be much of an improvement.


It should be for:
- signalling enhancements
- improved power supply
- new "resilience measures" to counter late-running freight services - I
think this just means a new/reinstated freight loop
- platform extensions for 6-car trains where necessary
- frequency doubling to 8tph

I'm not sure how they are squeezing the £91m for those measures, but
that's what it's for.

--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London





---
avast! Antivirus: Outbound message clean.
Virus Database (VPS): 0524-0, 13/06/2005
Tested on: 13/06/2005 15:57:48
avast! - copyright (c) 1988-2004 ALWIL Software.
http://www.avast.com



  #5   Report Post  
Old June 13th 05, 04:01 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,158
Default Improvements to the North London Line

MaxB wrote:
What about some improvements to the South London Line? Reinstating a station
at Brixton (with platform level interchange to the main line) would be a
start!


This is being considered as part of the second phase of the East London
Line project, but it would cost an absolute fortune; the previous
station on the SLL at Brixton was halfway to Loughborough Junction, and
constructing new platforms at Brixton itself would be extremely
difficult. It would probably cost about £70m just by itself.


--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London


  #6   Report Post  
Old June 13th 05, 09:59 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 26
Default Improvements to the North London Line

And Heaven forbid that we should spend any money south of the river, after
all we have the South Circular to keep us happy (well occupied anyway)!

--
Regards,
Max Batten

Visit me at http://www.thebattens.ndonet.com

"Dave Arquati" wrote in message
...
MaxB wrote:
What about some improvements to the South London Line? Reinstating a
station at Brixton (with platform level interchange to the main line)
would be a start!


This is being considered as part of the second phase of the East London
Line project, but it would cost an absolute fortune; the previous station
on the SLL at Brixton was halfway to Loughborough Junction, and
constructing new platforms at Brixton itself would be extremely difficult.
It would probably cost about £70m just by itself.


--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London





---
avast! Antivirus: Outbound message clean.
Virus Database (VPS): 0524-0, 13/06/2005
Tested on: 13/06/2005 22:59:48
avast! - copyright (c) 1988-2004 ALWIL Software.
http://www.avast.com



  #7   Report Post  
Old June 14th 05, 10:45 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2003
Posts: 168
Default Improvements to the North London Line


"MaxB" wrote in message
...
What about some improvements to the South London Line? Reinstating a

station
at Brixton (with platform level interchange to the main line) would be a
start!
Regards,
Max B

Does anybody have comparative figures of the number of miles of commuter
rail north and south of the Thames and within the M25 ?
Cheerz,
Baz


  #8   Report Post  
Old June 19th 05, 10:58 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jun 2005
Posts: 11
Default Improvements to the North London Line

I REALLY would like to know !!
Cheerz,
Baz

  #9   Report Post  
Old June 19th 05, 11:02 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2003
Posts: 168
Default Improvements to the North London Line


"Marratxi" wrote in message
...
"MaxB" wrote in message
...
What about some improvements to the South London Line? Reinstating a

station
at Brixton (with platform level interchange to the main line) would be a
start!
Regards,
Max B

Does anybody have comparative figures of the number of miles of commuter
rail north and south of the Thames and within the M25 ?
Cheerz,
Baz

This is what I REALLY want to know !! I'm sure somebody, somewhere knows.
Cheerz,
Baz


  #10   Report Post  
Old June 18th 05, 03:41 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jun 2005
Posts: 2
Default Improvements to the North London Line

Who wants to go to south London any way??

Loopy

"MaxB" wrote in message
...
What about some improvements to the South London Line? Reinstating a
station at Brixton (with platform level interchange to the main line)
would be a start!

--
Regards,
Max B

Visit me at http://www.thebattens.ndonet.com

"Dave Arquati" wrote in message
...
wrote:
He (Ken Livingstone) added: "Simply bidding for the Games has brought
forward a host of transport improvements - with the East London Line
extension, the new £400m ticket hall at King's Cross, and the £91m
package of improvements to the North London Line all given added
momentum."
What are the improvements to the NLL? £91M doesn't seem to by much
these days so it can't be much of an improvement.


It should be for:
- signalling enhancements
- improved power supply
- new "resilience measures" to counter late-running freight services - I
think this just means a new/reinstated freight loop
- platform extensions for 6-car trains where necessary
- frequency doubling to 8tph

I'm not sure how they are squeezing the £91m for those measures, but
that's what it's for.

--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London





---
avast! Antivirus: Outbound message clean.
Virus Database (VPS): 0524-0, 13/06/2005
Tested on: 13/06/2005 15:57:48
avast! - copyright (c) 1988-2004 ALWIL Software.
http://www.avast.com







Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Oyster product pickup improvements Matthew Dickinson London Transport 120 March 4th 17 12:30 PM
Leyton Station improvements Martin Petrov[_2_] London Transport 1 October 30th 11 07:19 PM
Shepherds Bush Central line station improvements Paul Scott London Transport 5 August 30th 07 11:09 PM
C-charge monitoring shows sustained traffic improvements TravelBot London Transport News 0 August 28th 06 08:29 AM


All times are GMT. The time now is 04:04 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017