Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#19
![]() |
|||
|
|||
![]()
In article , Jack Taylor
writes Until new stock is ordered they are unlikely to start running through. The Class 365s, currently used by WAGN, do not have end-doors for use in emergencies (like the 319s do), which is a requirement for the tunnel sections. The tunnels are all double-track, aren't they? Apart from the new (short) links. 365s already run through single-track tunnels between Ally Pally and Potters Bar. -- Clive D.W. Feather | Home: Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org Fax: +44 870 051 9937 | Work: Please reply to the Reply-To address, which is: |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Exciting news on Thameslink 2000 (now "Thameslink Project") | London Transport | |||
Thameslink 2000 and other animals | London Transport | |||
Thameslink 2000 | London Transport | |||
THAMESLINK 2000 | London Transport | |||
New Thameslink 2000 proposals? | London Transport |