Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#6
![]() |
|||
|
|||
![]()
In message , Roland Perry
writes Are those the tunnels that are currently used by taxis, and have a "loading gauge" hanging over the entrance? Or are the service tunnels in addition to those? It looks like it. A proposed route is shown on page 3 of ... http://www.atsltd.co.uk/media/casest...se_studies.pdf Page 4 shows (somewhat surprisingly) that it is possible to fit four people-mover tracks inside one service tunnel - although it doesn't explain what will be done with the displaced taxi traffic! I wonder if there might be room to retain a taxi-way below the upper pair of tracks? The maps on pages 59-62 of the Heathrow Masterplan (big download) ... http://www.heathrowairport.com/asset...MasterPlan.pdf show more extended systems, with different routes, to take account of the third runway proposal. -- Paul Terry |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Heathrow PRT pods now in service at last? | London Transport | |||
Heathrow T5 Pods (aka 'ULTra PRT') begin three week "confidence trials". | London Transport | |||
ULTra cool | London Transport | |||
Why doesn't London goverment allow to build high building? | London Transport | |||
Canary Wharf Group to design and build Isle of Dogs station | London Transport |