Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]() Peter Masson wrote: "asdf" wrote AFAIK, the Widened Lines to Moorgate were unelectrified until the time of the BedPan electrification, whereupon OHLE was put up. They've never had 3rd or 4th rail (unlike the adjacent LU tracks). AIUI the eastbound Widened Line was electrified (4th rail system) between 1926 and 1935, when Met trains terminating at Moorgate used the Widened Lines from a crossover at Kings Cross to the terminal platforms at Moorgate. In the reverse direction the Circle line track was used. This reduced conflicts at Moorgate. This arrangement was abolished in 1935 when the Kings Cross (Circle Line) was relocated from its original position adjacent to the current Thameslink station to its current position. Peter It puzzles me that LU insists on running Met Line trains thru to Aldgate. The Junction there must be an operating challenge. Meanwhile there is ample unused capacity at Moorgate. Surely the walk saved to City employment centers cannot be so much shorter from Aldgate? |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Charged more to cross London than Aberystwyth to London UPDATE | London Transport | |||
North London Line update | London Transport | |||
East London Line update | London Transport | |||
End of London's Trams Update | London Transport | |||
East London Line Progress Update | London Transport |