Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
Mizter T wrote:
Dave Arquati wrote: This time it's Maryland - CLRL held discussions with LB Newham earlier in the year, and have now decided that Crossrail trains can serve Maryland with selective door opening (I imagine that this means the front 8 carriages only). Great, that'll make it easy to get to Chesapeake Bay... Naff jokes aside, that's good news. Plus, given that the plan was for some extra non-Crossrail local trains which were going to stop at Maryland whilst sharing the Great Eastern slow line with Crossrail (and terminate or start from Liverpool Street proper), there was the potential operational issue of Crossrail trains getting backed up behind these extra trains whilst they stopped at Maryland. That won't be an issue now. So - the 20 billion pound sterling question Mr Arquati - do you think this railway line will ever get built, and if so when? I know the Crossrail Bill is making progress, but someone needs to get their wallet out and agree to pay for it. (I forsee civil servants concocting various horrible potential PPP/PFI arrangements!). My not-yet-professional feeling is "yes, but...". It'll get built if someone can arrange some sort of land value capture to pay for it (a tool which, AIUI, could have paid for much of the Jubilee line extension). There was a proposed business levy, but that would only have paid for a small chunk of the total bill. Some of the professors from my department are much more sceptical about it even being built, and it's hard to blame them... I certainly don't see work starting on it before the Olympics, so I'd go for a 2018 (optimistic!) ETA... -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] | London Transport | |||
Another new Tube station opens for business - West Ashfield | London Transport | |||
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) | London Transport | |||
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) | London Transport | |||
Another "Crapita" CC screw up | London Transport |