Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]() Dave Arquati wrote: Not what I heard - the following parliamentary debate suggests £200m for the northern part of (what was) Phase 2 - Dalston Junction to Caledonian Road & Barnsbury. That includes turnback facilities at CR&B, possibly extra tracks somewhere between there and Dalston, the reinstated curve at Dalston, a replacement junction on the NLL (obviously the old one isn't there any more) and probably some resignalling. Then again, reinstating a significantly longer section of track in south London and building a new station at Surrey Canal Road seems to cost much less (£75m), so I'm not sure what difference is for. Is the formation at Dalston still in Network Rail's hands? The figure quoted could have been rubbish of course. Kevin |
#2
![]() |
|||
|
|||
![]()
Kev wrote:
Dave Arquati wrote: Not what I heard - the following parliamentary debate suggests £200m for the northern part of (what was) Phase 2 - Dalston Junction to Caledonian Road & Barnsbury. That includes turnback facilities at CR&B, possibly extra tracks somewhere between there and Dalston, the reinstated curve at Dalston, a replacement junction on the NLL (obviously the old one isn't there any more) and probably some resignalling. Then again, reinstating a significantly longer section of track in south London and building a new station at Surrey Canal Road seems to cost much less (£75m), so I'm not sure what difference is for. Is the formation at Dalston still in Network Rail's hands? The figure quoted could have been rubbish of course. I think for any major public project, cost quotes can vary so wildly between reports to be as good as useless. -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
London Overground from 11 Nov 2007 | London Transport | |||
London Overground - lack of engineering works information | London Transport | |||
New signs on London Overground | London Transport | |||
London Overground Ticketing - t&c's | London Transport | |||
London Overground Concession Award | London Transport |