London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old September 6th 06, 10:39 AM posted to uk.transport.london
Kev Kev is offline
external usenet poster
 
First recorded activity at LondonBanter: Nov 2005
Posts: 221
Default London Overground


Dave Arquati wrote:


Not what I heard - the following parliamentary debate suggests £200m for
the northern part of (what was) Phase 2 - Dalston Junction to Caledonian
Road & Barnsbury. That includes turnback facilities at CR&B, possibly
extra tracks somewhere between there and Dalston, the reinstated curve
at Dalston, a replacement junction on the NLL (obviously the old one
isn't there any more) and probably some resignalling.

Then again, reinstating a significantly longer section of track in south
London and building a new station at Surrey Canal Road seems to cost
much less (£75m), so I'm not sure what difference is for. Is the
formation at Dalston still in Network Rail's hands?


The figure quoted could have been rubbish of course.

Kevin

  #2   Report Post  
Old September 6th 06, 11:42 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2006
Posts: 191
Default London Overground

Kev wrote:
Dave Arquati wrote:

Not what I heard - the following parliamentary debate suggests £200m for
the northern part of (what was) Phase 2 - Dalston Junction to Caledonian
Road & Barnsbury. That includes turnback facilities at CR&B, possibly
extra tracks somewhere between there and Dalston, the reinstated curve
at Dalston, a replacement junction on the NLL (obviously the old one
isn't there any more) and probably some resignalling.

Then again, reinstating a significantly longer section of track in south
London and building a new station at Surrey Canal Road seems to cost
much less (£75m), so I'm not sure what difference is for. Is the
formation at Dalston still in Network Rail's hands?


The figure quoted could have been rubbish of course.


I think for any major public project, cost quotes can vary so wildly
between reports to be as good as useless.


--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
London Overground from 11 Nov 2007 Ken London Transport 177 November 19th 07 01:40 AM
London Overground - lack of engineering works information Mizter T London Transport 0 November 17th 07 06:45 AM
New signs on London Overground [email protected] London Transport 9 November 14th 07 08:49 PM
London Overground Ticketing - t&c's Paul G London Transport 9 November 11th 07 11:22 PM
London Overground Concession Award Paul Corfield London Transport 70 July 10th 07 07:31 AM


All times are GMT. The time now is 10:07 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017