London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old January 27th 07, 12:11 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: May 2006
Posts: 130
Default City Thameslink gateline

Recently I've noticed that a mixture of automatic and manual ticket
gates are being installed at City Thameslink. What I'd like to know is:
1 - why the gates at the Holborn Viaduct end are installed in a position
such that one of the ticket office windows is subsequently located in
the 'paid-area' of the station (once the gateline goes live), and;
2 - have they installed enough gates at both ends of the station
(available space permitting) to avoid a repeat of the peak-hour crush at
Farringdon?
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Oyster PAYG gateline experiment Sky Rider London Transport 10 January 14th 10 10:21 AM
UTS Gateline codes Q London Transport 0 November 12th 09 10:10 PM
Stratford Jubilee gateline defunct Walter Briscoe London Transport 1 October 1st 09 06:24 PM
Wandsworth Town station gateline Lucas London Transport 20 August 18th 09 03:50 PM
Waterloo gateline Matthew Dickinson London Transport 85 January 7th 09 10:28 AM


All times are GMT. The time now is 06:24 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017