London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #7   Report Post  
Old July 5th 07, 10:48 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2007
Posts: 13
Default North London Line goes 4-car in early 2011

That's the main culprit. Quite a lot need little work other than
stripping/resurfacing/drainage cleaning. WJ is the difficult one to squeeze
another car length out of. Even SDO (to use the inner doors only of the end
cars) wouldn't work, due to the siting of the signalling.


Pardon my ignorance, but what signaling problems would affect the use of
SDO, such as not releasing the doors in the rear coach?
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Last class 378 goes 5 car [email protected] London Transport 8 February 18th 16 10:08 AM
Last class 378 goes 5 car eastender[_5_] London Transport 2 February 16th 16 10:00 PM
RAIB Investigation into an incident at Warren Street station, Victoria Line, London Underground, 11 July 2011 Mizter T London Transport 3 August 5th 11 03:49 PM
Four-car North London Line Dr. Sunil London Transport 3 October 27th 10 11:26 AM


All times are GMT. The time now is 09:20 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017