On Mon, 13 Aug 2007, Mr Thant wrote:

On Aug 12, 11:55 pm, somersetchris somersetchris.
wrote:

The only bottle neck will be Canonbury tunnel.


I meant the ECML diveunder south of Finsbury Park station, which I don't
think could be fixed to be double track very easily (I realise there is
a second track already, but it's pretty heavily used by trains from
Moorgate)


?

Okay, are we now talking about terminating the ELL at Finsbury Park, by
reversing out of a bay platform on what is now the Canonbury reversible
line? If so, yes, you're quite right - you'd need to make that diveunder
three-track, or else you have a single-lead approach that stretches all
the way to the NLL. From the air, there looks like there's enough space to
add a third track; are there pillars or something in the way down there?
Failing that, there are a couple of places you could put in passsing
loops: around Drayton Park, and between the diveunder and the station
(exploiting the existing goods track that joins the down Canonbury from
the main line).

Given that there will still be a single-track bit through the tunnel, how
much difference does this really make?

tom

--
a draw was agreed once the pieces started melting
The line could be doubled from inside the tunnel through to Drayton Park (it looks as though it used to be!). It is only the curve at the NLL end which would have to stay single I think. But I am not sure on that. There are a lot of wires inside the tunnel at that end on the curve which I think must be something to do with gauging.
The line towards Finsbury Park is already called the up and down Canonbury as it is already reversible. Therefore up trains (towards NLL) could use this if the down slow 2 was made reversible between the Finsbury Park and the junction onto the Northern Heights line, with the disused platform next to platform 6 at Finsbury Park reopened. Down trains would go onto what is now the down Moorgate.
Trains from Highgate could alternate with trains from the GN going to Moorgate or the NLL.
The main parts of infrastructure required would be between Finsbury Park and Drayton Park, also reopening the disused platform at Finsbury Park. It would just need up trains from Highgate to run up Down slow 2 from the Northern Heights line junction through to the Drayton Park area
  #2   Report Post  
Old August 13th 07, 03:56 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2003
Posts: 3,188
Default Extend the ELL to Alexandra Palace?

On Mon, 13 Aug 2007, somersetchris wrote:

Tom Anderson;65118 Wrote:

On Mon, 13 Aug 2007, Mr Thant wrote:

On Aug 12, 11:55 pm, somersetchris somersetchris.
wrote:

The only bottle neck will be Canonbury tunnel.

I meant the ECML diveunder south of Finsbury Park station, which I
don't think could be fixed to be double track very easily (I realise
there is a second track already, but it's pretty heavily used by
trains from Moorgate)


Given that there will still be a single-track bit through the tunnel,
how much difference does this really make?


The line could be doubled from inside the tunnel through to Drayton
Park (it looks as though it used to be!).


It did. But didn't someone suggest that it couldn't be redoubled while
also maintaining a freight-suitable loading gauge there? The curve is
quite an important link for freight, so that's rather important.

Perhaps it might be possible to arrange things so that one track is
cleared to W8 (or whatever) and the other only to W6A, signal the W8
reversibly, and just send all freight along that. It could even be
W8-and-only-when-nothing's-on-the-other-track, since it's not a very long
bit.

It is only the curve at the NLL end which would have to stay single I
think. But I am not sure on that.


Don't know. I'd assumed that was once double too, but i really have no
idea.

There are a lot of wires inside the tunnel at that end on the curve
which I think must be something to do with gauging. The line towards
Finsbury Park is already called the up and down Canonbury as it is
already reversible. Therefore up trains (towards NLL) could use this if
the down slow 2 was made reversible between the Finsbury Park and the
junction onto the Northern Heights line, with the disused platform next
to platform 6 at Finsbury Park reopened. Down trains would go onto what
is now the down Moorgate. Trains from Highgate could alternate with
trains from the GN going to Moorgate or the NLL.


Sounds about right. That kind of sharing of bits of line between two
services is asking for trouble, though.

The main parts of infrastructure required would be between Finsbury Park
and Drayton Park, also reopening the disused platform at Finsbury Park.
It would just need up trains from Highgate to run up Down slow 2 from
the Northern Heights line junction through to the Drayton Park area


You still have ELL trains crossing the entire NLL on the flat east of the
Canonbury junction.

tom

--
And the evening and the morning were the fifth day.
  #3   Report Post  
Old October 5th 07, 09:59 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2004
Posts: 110
Default Extend the ELL to Alexandra Palace?

On 13 Aug, 16:56, Tom Anderson wrote:

It did. But didn't someone suggest that it couldn't be redoubled while
also maintaining a freight-suitable loading gauge there? The curve is
quite an important link for freight, so that's rather important.


Wasn't the reason for the singling to create enough height for
overhead line equipment, by moving the single remaining line to the
centre of the tunnel?

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Using Oyster to extend a Season Ticket Mizter T London Transport 0 September 23rd 13 02:05 PM
ELL works at Croydon and Crystal Palace Paul Scott London Transport 3 July 30th 08 05:10 PM
Cheapest way to extend Bakerloo south of E&C? Jim Brown London Transport 10 March 26th 05 01:59 PM
Ken says yes to Crystal Palace tram extension John Rowland London Transport 51 October 20th 04 09:41 AM
Crystal Palace solution John Rowland London Transport 23 October 10th 04 10:29 PM


All times are GMT. The time now is 04:21 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017