Quote:
Originally Posted by Tom Anderson View Post
On Mon, 13 Aug 2007, Mr Thant wrote:

On Aug 12, 11:55 pm, somersetchris somersetchris.
wrote:

The only bottle neck will be Canonbury tunnel.


I meant the ECML diveunder south of Finsbury Park station, which I don't
think could be fixed to be double track very easily (I realise there is
a second track already, but it's pretty heavily used by trains from
Moorgate)


?

Okay, are we now talking about terminating the ELL at Finsbury Park, by
reversing out of a bay platform on what is now the Canonbury reversible
line? If so, yes, you're quite right - you'd need to make that diveunder
three-track, or else you have a single-lead approach that stretches all
the way to the NLL. From the air, there looks like there's enough space to
add a third track; are there pillars or something in the way down there?
Failing that, there are a couple of places you could put in passsing
loops: around Drayton Park, and between the diveunder and the station
(exploiting the existing goods track that joins the down Canonbury from
the main line).

Given that there will still be a single-track bit through the tunnel, how
much difference does this really make?

tom

--
a draw was agreed once the pieces started melting
The line could be doubled from inside the tunnel through to Drayton Park (it looks as though it used to be!). It is only the curve at the NLL end which would have to stay single I think. But I am not sure on that. There are a lot of wires inside the tunnel at that end on the curve which I think must be something to do with gauging.
The line towards Finsbury Park is already called the up and down Canonbury as it is already reversible. Therefore up trains (towards NLL) could use this if the down slow 2 was made reversible between the Finsbury Park and the junction onto the Northern Heights line, with the disused platform next to platform 6 at Finsbury Park reopened. Down trains would go onto what is now the down Moorgate.
Trains from Highgate could alternate with trains from the GN going to Moorgate or the NLL.
The main parts of infrastructure required would be between Finsbury Park and Drayton Park, also reopening the disused platform at Finsbury Park. It would just need up trains from Highgate to run up Down slow 2 from the Northern Heights line junction through to the Drayton Park area
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Using Oyster to extend a Season Ticket Mizter T London Transport 0 September 23rd 13 02:05 PM
ELL works at Croydon and Crystal Palace Paul Scott London Transport 3 July 30th 08 05:10 PM
Cheapest way to extend Bakerloo south of E&C? Jim Brown London Transport 10 March 26th 05 01:59 PM
Ken says yes to Crystal Palace tram extension John Rowland London Transport 51 October 20th 04 09:41 AM
Crystal Palace solution John Rowland London Transport 23 October 10th 04 10:29 PM


All times are GMT. The time now is 11:13 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017