Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
At Canning Town, I descended by stairs from the Bus Station to the
Jubilee Line ticket office platform. I noticed the escalator was being replaced. I was confused by a notice saying escalator replacement takes 6 weeks and the replacement would end in July 2008. A CSA explained July 2008 was the date for the escalator system replacement program to end. Does anybody here know the story? ISTR that line was opened in 2000 for the Millennium. What is the design life of an LU escalator. -- Walter Briscoe |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Replacement boat service on the Jubilee Line this weekend | London Transport | |||
Canning Town DLR junctions | London Transport | |||
A13 Canning Town and East India Dock Link Tunnel | London Transport | |||
Canning Town footpaths | London Transport | |||
A13 - Canning Town (new) Flyover virtually complete! | London Transport |