London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old August 31st 07, 08:28 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2005
Posts: 392
Default canning town jubilee line replacement program

At Canning Town, I descended by stairs from the Bus Station to the
Jubilee Line ticket office platform. I noticed the escalator was being
replaced. I was confused by a notice saying escalator replacement takes
6 weeks and the replacement would end in July 2008. A CSA explained July
2008 was the date for the escalator system replacement program to end.
Does anybody here know the story? ISTR that line was opened in 2000 for
the Millennium. What is the design life of an LU escalator.
--
Walter Briscoe
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Replacement boat service on the Jubilee Line this weekend Offramp London Transport 8 March 11th 10 11:03 PM
Canning Town DLR junctions TheOneKEA London Transport 7 November 25th 04 10:50 AM
A13 Canning Town and East India Dock Link Tunnel Dr. Sunil London Transport 0 October 4th 04 10:18 AM
Canning Town footpaths Annabel Smyth London Transport 7 April 8th 04 11:25 PM
A13 - Canning Town (new) Flyover virtually complete! Dr. Sunil London Transport 6 October 6th 03 07:04 PM


All times are GMT. The time now is 04:19 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017