Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#12
![]() |
|||
|
|||
![]()
David Hansen wrote:
On Thu, 6 Dec 2007 09:28:04 -0000 someone who may be "Mortimer" wrote this:- But why was it not picked up by an inspector or supervisor? Irrespective of what the drawings may say or imply, any fool would spot that it didn't look right within a few seconds as James did when he passed through on the train. Any contractor building it would build it to the drawing they had been given, even if they can see that it is wrong. Their reasoning is that it is a lucrative daywork to put it right. A mate has an engraving business. BNFL wanted some new indicator boards naming, so sent him the drawings. He saw immediately that they were wrong, so rang them. "What version drawing have you got?" "X.XX" "Well, thats the latest, so they cannot be wrong. Get the signs done, as we need them ASAP" So he made them, sent them off Special Delivery, and got a phone call the next day - "these signs are not right" "I know, you told me to make them, even though I told you they were wrong" "Well, the drawing has been changed since, so remake them to the new drawing." That'd be the new drawing that he hadnt got, but which apparently was version 1 of the drawings. So they sent him a new set of drawings by fax. Which were exactly the same as before. He didnt want to go through with the rigmarole again, so said he wasnt making them again until the proper drawings were sent. Who he spoke to was adamant that the drawings were right. He said he comes across such incompetence every week of the year - he had an engineering graduate come to have a look at what he does - the grad picked up a digital vernier guage and said "i've never seen one of these in the flesh before". He was astounded - apparently Eng. Grads. no longer do any practical work at all, they just sit in front of a computer to do their designs/work, so I can understand why the platform width wasnt noticed. Alan. -- To reply by e-mail, change the ' + ' to 'plus'. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
New Stations announced by Dft | London Transport | |||
New Roads, New Traffic Lights, New Post Code | London Transport | |||
New WLL stations | London Transport | |||
Visiting London & Newcastle: any suggested stations | London Transport | |||
New Abbreviation for two LU stations. | London Transport |