Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#8
![]() |
|||
|
|||
![]() Paul Scott wrote: SWT's advance engineering works info for the Easter weekend shows a 6 tph service through East Putney. Will this result in a much reduced District Line service? "Two Basingstoke/Alton to Waterloo services per hour, two Woking to Waterloo services per hour and two Shepperton to Waterloo services per hour diverted via East Putney. (Sunday: Woking service starts at Guildford; one Kingston via Shepperton and one Twickenham via Kingston)." info from SWT website: http://www.southwesttrains.co.uk/SWT...Easter2008.htm Presumably this will all be a bit harder to organise if/when TfL take full responsibility for the line at some time in the future, such as at SSL resignalling? Paul My understanding was that when the Putney to Wimbledon stretch was handed over to LUL at privatisation, there was an agreement reached with regards to continuing 'National Rail' use of the line - and it is under this agreement that SWT makes use of the line for diversionary purposes. Given that SWT do find it a valuable route (as demonstrated by the use they'll be making of it at Easter), one can't see them (or the DfT) being keen on ending that agreement. Therefore, the onus would seem to fall on LUL ensuring that any future resignalling on this line can accommodate National Rail trains. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Overrun of engineering work on the Wimbledon Branch | London Transport | |||
National rail south east - any single engineering works source? | London Transport | |||
Validity of +Any Permnitted during engineering works | London Transport | |||
Planned engineering works | London Transport | |||
Planned engineering works | London Transport |