Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#3
![]() |
|||
|
|||
![]()
On 14 Jan, 17:01, MIG wrote:
On Jan 14, 4:48 pm, "Paul Scott" wrote: SWT's advance engineering works info for the Easter weekend shows a 6 tph service through East Putney. Will this result in a much reduced District Line service? "Two Basingstoke/Alton to Waterloo services per hour, two Woking to Waterloo services per hour and two Shepperton to Waterloo services per hour diverted via East Putney. (Sunday: Woking service starts at Guildford; one Kingston via Shepperton and one Twickenham via Kingston)." info from SWT website:http://www.southwesttrains.co.uk/SWT...Easter2008.htm Presumably this will all be a bit harder to organise if/when TfL take full responsibility for the line at some time in the future, such as at SSL resignalling? Paul I would have thought that the single track approach to East Putney and crossing all the Putney tracks on the flat might be a bigger problem. I forget how the lines there are paired - UIVMM it changed fairly recently. But the single track up to East Putney is on the southern side of the four mainline tracks and hence comes off one of the down lines - so up trains are the ones that will cause more disturbances here. (Without looking at Quail, which isn't to hand, I forget which location Point Pleasant junction actually refers to - the junction with the mainline or with the District line at East Putney station.) Avoiding both Putney trains and District line trains either side of the junction must be quite a challenge. Though LUL contracts Network Rail to signal the line from East Putney (or from Putney Bridge in fact) down to Wimbledon, so theoretically at least there could be a slightly more co-ordinated approach (or just a jam of backed up District line trains being held at East Putney so a diverted SWT service can get down there first). |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Overrun of engineering work on the Wimbledon Branch | London Transport | |||
National rail south east - any single engineering works source? | London Transport | |||
Validity of +Any Permnitted during engineering works | London Transport | |||
Planned engineering works | London Transport | |||
Planned engineering works | London Transport |