Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#19
![]() |
|||
|
|||
![]()
chunky munky wrote:
On Jan 14, 8:06 pm, Charles Ellson wrote: On Mon, 14 Jan 2008 12:51:02 -0600, David Jackman pleasereplytogroup wrote: "Paul Scott" wrote in : SWT's advance engineering works info for the Easter weekend shows a 6 tph service through East Putney. Will this result in a much reduced District Line service? "Two Basingstoke/Alton to Waterloo services per hour, two Woking to Waterloo services per hour and two Shepperton to Waterloo services per hour diverted via East Putney. (Sunday: Woking service starts at Guildford; one Kingston via Shepperton and one Twickenham via Kingston)." info from SWT website: http://www.southwesttrains.co.uk/SWT...Easter2008.htm http://www.tfl.gov.uk/assets/livetra...me/tube/track- closures.pdf has work for that weekend as affecting: "Baker Street to Hammersmith (Hammersmith & City) - No Circle - Earl's Court to Edgware Road (District)" So I'd suggest the Edware Road-Wimbledon service won't run atall which frees up the required paths from East Putney. The above seems to imply that Wimbleware trains will be reversing at Earls/Earl's Court (via Triangle Sidings?). The Edgware Road service will be diverted to run Edgware Road - Olympia, But LU say no District service between Earl's Court and Edgware Road. -- Richard J. (to e-mail me, swap uk and yon in address) |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Overrun of engineering work on the Wimbledon Branch | London Transport | |||
National rail south east - any single engineering works source? | London Transport | |||
Validity of +Any Permnitted during engineering works | London Transport | |||
Planned engineering works | London Transport | |||
Planned engineering works | London Transport |