London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old August 31st 03, 11:22 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 2,146
Default Old LT Garages

In article ,
(Paul Terry) wrote:

It seems extraordinary to think that the entire Hammersmith one-way
system must have been rewired for a very complex overhead trolley
system with numerous junctions, only to have the whole lot torn down a
few months later when trolleybus operations ceased.


It was more than a few months. I think Butterwick was either already there
when I started school in Hammersmith Road in 1957 or was built shortly
afterwards. I don't think it was as late as 1959/60. They did make some
overhead alterations in Butterwick before abandonment but I can't now
remember the details.

--
Colin Rosenstiel
  #2   Report Post  
Old September 2nd 03, 05:11 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 36
Default Old LT Garages

In message ,
Colin Rosenstiel writes

In article ,
(Paul Terry) wrote:

It seems extraordinary to think that the entire Hammersmith one-way
system must have been rewired for a very complex overhead trolley
system with numerous junctions, only to have the whole lot torn down a
few months later when trolleybus operations ceased.


It was more than a few months. I think Butterwick was either already there
when I started school in Hammersmith Road in 1957 or was built shortly
afterwards. I don't think it was as late as 1959/60. They did make some
overhead alterations in Butterwick before abandonment but I can't now
remember the details.


Yes, trolleybuses first started using Butterwick on 13 July 1958 (I have
at last managed to lay my hands on some decent reference material).

However, according to Taylor's London Trolleybus Routes, "Between 1958
and 1960 the routes underwent continual wiring alterations at
Hammersmith due to the construction of Hammersmith flyover". The latter
was still being built in 1960, of course, and photos from that year show
that much of the south side of the one-way system was far from complete,
even though open for traffic.

--
Paul Terry
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Non-London Vehicles In London Bus Garages Sharon & Gordon Thomson London Transport 1 September 15th 04 10:14 PM
South Harrow old station John Rowland London Transport 4 September 19th 03 01:02 PM
New Purpose found for old Aldwych Branch Cast_Iron London Transport 2 July 24th 03 10:11 AM
New Purpose found for old Aldwych Branch [email protected] London Transport 0 July 23rd 03 03:35 PM
New Purpose found for old Aldwych Branch Richard J. London Transport 0 July 23rd 03 02:50 PM


All times are GMT. The time now is 12:20 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017