Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#4
![]() |
|||
|
|||
![]()
On 25 Jan, 15:16, Mizter T wrote:
At the moment passengers can reach the Hammersmith and City line platforms without passing through a gate, and on those platforms are a couple of standalone Oyster readers. Why'd you use the validators? Being touched-in and on the platforms is a consistent situation already, so you can either go out the gates like an H&C passenger or continue your tube journey. U -- http://londonconnections.blogspot.com/ A blog about transport projects in London |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Planned engineering work between Acton Town and Hammersmith this weekend | London Transport | |||
Planned engineering work between Acton Town and Hammersmith this weekend | London Transport | |||
Engineering work ticket validity | London Transport | |||
Weekend engineering work | London Transport | |||
Tramlink engineering work. | London Transport |