Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#8
![]() |
|||
|
|||
![]()
On 25 Mar, 09:05, The Real Doctor wrote:
I thought about the cost of stations - then remembered that the Jubilee *Line extension included four new underground stations, interchanges with three existing underground stations (plus 2 new and 2 altered surface stations) and it /still/ only (sic) £3.5bn. That's not just a bit less than Crossrail - that's one fifth of the predicted Crossrail cost. But Crossrail includes 8 underground stations, most with two entrances (doubling many of the costs), the rebuilding of several miles of Great Western Main Line including two grade-separated junctions (Heathrow and Acton Yard), the electrification of 11 miles of GWML (requiring the rebuilding of about ten bridges in Slough), rebuilding a of a fair bit of GEML, rebuilding of ca. 30 stations (about half will be completely demolished) and so on. It's a much larger project. U -- http://londonconnections.blogspot.com/ A blog about transport projects in London |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Ken Livingstone Polluting the Planet | London Transport | |||
KEN LIVINGSTONE: RACIST | London Transport | |||
London population not increasing as much as Ken Livinstone says | London Transport | |||
A big Thank You to Ken Livingstone | London Transport | |||
Ken says yes to Crystal Palace tram extension | London Transport |