London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old June 3rd 08, 08:37 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jun 2008
Posts: 2
Default Blackfriars - SET services after December 2008

What will happen to SouthEastern train services into Blackfriars after
December 2008 - diverted to Victoria, cancelled, or will there be a limited
service continuing through to City Thameslink and terminating at Smithfield
sidings?

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
6 Thameslink services to avoid after March 2009 Sky Rider London Transport 0 October 31st 08 04:53 PM
Withdrawal of Off Peak Inter-City services from Watford Junction to North West - Dec 2008 burkey London Transport 0 February 24th 07 12:35 AM
SET 376 - A big disappointment Rich Mallard London Transport 36 February 24th 05 12:41 PM
376 diagrams on SET website Rupert Candy London Transport 0 October 15th 04 10:16 AM
LUL set to close Met line daveb London Transport 19 February 16th 04 04:15 PM


All times are GMT. The time now is 11:57 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017