Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
|
|||
|
|||
NLL Camden Road work package reduced
Don't think anyone has mentioned the reduced scope of the NLL improvements,
basically the 4 tracking will not go as far as Camden Rd due to the state of the out of use bridges. This reduces the Stratford - Camden Rd service frequency in the off peak, as there is no longer a centre turnback. Details on the ORR site here, including track diagrams: http://www.rail-reg.gov.uk/upload/pd...808-annexa.pdf Paul S |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
NLL work brought forward - DfT | London Transport | |||
Camden Road - London Overground | London Transport | |||
Holloway Road Tube Work | London Transport | |||
Greatly reduced rail acess to Enfield over the weekend | London Transport | |||
Camden Town derailment - reduced refunds? | London Transport |