Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#3
![]() |
|||
|
|||
![]() On 16 Dec, 12:28, Mr Thant wrote: On 16 Dec, 12:18, Walter Briscoe wrote: The person who answered was not able to answer my next question: will the Main Ticket Hall and the Jubilee Line Concourse be joined on the level rather than via escalators, lifts and stairs as currently happens? No, because the tracks through the middle will also be reused by the DLR, to reach Stratford International. Indeed. It's is a rather odd arrangement for their to be tracks running through a station concourse - though of course the alignment came first, the concourse being pretty recent innovation, as it's a result of the mid/late 90's rebuild of Stratford station for the Jubilee Line Extension. It rather puts me in mind of the old arrangement at Waterloo, whereby there was a little-used line that ran through the concourse linking the L&SWR's mainlines with the SER's lines at what is now called Waterloo East (the cast iron bridge over Waterloo Road being a remnant of this). |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Stratford platform 3a | London Transport | |||
New Central Line platform at Stratford | London Transport | |||
Stratford Regional-Stratford Intl on DLR | London Transport | |||
Stratford platform widening | London Transport | |||
Crew changes (was East Finchley) | London Transport |