Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]() "Mr Thant" wrote There is no case for spare long platforms in case of weekend engineering works on Thameslink etc either... If the majority of the Thameslink fleet is indivisible 12 car trains, then yes there is. 9 long and 3 short platforms should be enough for 5 tph NXEC, 6 tph Cambridge/Peterborough, 4 (or even 8) tph inner suburban, if they can't go back to Moorgate, and one HT/GC/GN. Peter |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Euston Square Undrground Station | London Transport | |||
Euston mainline station basements | London Transport | |||
Euston Mainline Station basements | London Transport | |||
London Victoria to Euston Station by Taxi | London Transport | |||
Euston Square station works | London Transport |