Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#5
![]() |
|||
|
|||
![]()
On Feb 22, 12:41*pm, Ganesh Sittampalam
wrote: You can reduce failure rates with high quality production and maintenance, but you can't eliminate them. A single failure doesn't tell you much about the quality of the underlying system. No , but constant failures all the time does. B2003 |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Northern line failure | London Transport | |||
Signal Failure | London Transport | |||
Signal failure on the central line? | London Transport | |||
How can you have a signal failure on an ATO system? | London Transport | |||
Why can't LU cope with a signal failure? | London Transport |