London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old February 24th 09, 12:35 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default Thameslink ATO Specification published

http://www.dft.gov.uk/pgr/rail/pi/th.../trainspec.pdf

Will also be applicable to Crossrail, and will form a National Network Rail
ATO specification, overlaid on ETCS.

Stacks of techno stuff...

Paul S


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
NLL Infrastructure specification agreed Mwmbwls London Transport 5 March 3rd 08 07:01 AM
How can you have a signal failure on an ATO system? Boltar London Transport 20 September 5th 07 05:48 AM


All times are GMT. The time now is 10:51 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017