Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#20
![]() |
|||
|
|||
![]()
On Mar 28, 4:57*pm, "John Rowland"
wrote: Back in the pre-Google Maps era I explored the area IRL and came to the conclusion that the only "structure" (which does not include the flat surface of Jarrow Road) On closer inspection the bridge carrying the Goblin has a redundant 3rd span on the west side where the west-to-north curve used to be. So there's enough space for four tracks without touching Jarrow Road or doing any bridge works. amazingly the new bridge to carry the railway over Mollison Avenue was built *wide* enough for four tracks - I can't see how the COBA worked out for that one, with no prospect of quadrupling in the air at the time. If it was paid for out of the road's budget, the only cost to BR (I assume it was that era) was that of a stern letter. U |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
8.5% cut in central govt grant to TfL; suburban West Anglia trainsto be devolved to TfL control | London Transport | |||
West Anglia Main Line Progress Report - DfT | London Transport | |||
DfT Working Group Report on the Crossrail Timetable | London Transport | |||
One West Anglia and WAP | London Transport |