Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Found this on a transport blog:
'Reports are that during 2011 the Sevenoaks service will return to Southeastern with First Capital Connect running a new Tonbridge via Bromley South, Orpington, Sevenoaks and Hildenborough service. First Capital Connect will also run a service from London Bridge to Dartford calling at St Johns and then split with all station services via both Lewisham/Welling and Sidcup/Crayford lines.' 'Maps have already been given out to developers in the City although it carries the disclaimer “This map shows a indicative route network. The 2011 Thameslink train service is subject to further evaluation and consultation by the DfT, including an assessment of the levels of train service at and through London Bridge during the construction phase of the station”.' URL: http://tinyurl.com/cwyw5l (check out the big paragraph in the middle) |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Thameslink KO1 major civils contracts | London Transport | |||
Dartford via Sidcup: Connex metro = 1tph? | London Transport | |||
Minimum speed limit sign after the dartford tunnel? | London Transport | |||
Will Travelcard Zone 6 ever expand to include Dartford stattion? | London Transport | |||
Will Travelcard Zone 6 ever expand to include Dartford stattion? | London Transport |