Default Watford Junction - Shops could be bulldozed for new road

On 13 July, 21:52, Andy wrote:
Provision of the passing loop at Bricket Wood would have had nothing
to do with the costs of the units needed to run the service. The class
350s, used by LM, cost a similar amount to the new LO class 378 units,
although it is hard to compare the costs to the train operating
company, as the rental cost of units seems to be much harder to find.
What would be cheaper is for LM to run the branch with the class 321s
that they are retaining, rather than switching to any form of new
unit.


I was led to believe that the point of the loop would be that you
could have two trains on the line at once, and due to them needing to
be 377s (or as you suggest 350s - like I say, I don't really care
about the trains themselves!), the economics didn't add up. More
juice, heavier, higher leasing...can't say I remember or indeed ever
knew the details.

On 13 July, 21:59, (Neil Williams)
wrote:
On Mon, 13 Jul 2009 13:25:23 -0700 (PDT), Jamie Thompson

wrote:
Yup, but one of the main reasons the passing loop got deferred is
because one of the franchise commitments that came in when LM took
over was to harmonise their fleet or some such, meaning that the line
can only be worked by a hugely excessive new 377, when a much smaller/
cheaper non-standard unit would suffice ( I believe a Silverlink Metro
unit used to operate the line before the franchise change).


It was a 313[1]. *But IMO it makes no sense to add it to the
incredibly slow DC lines. *Better use of the loop, if built, would be
to attach it to a self-contained AC Euston-Harrow-Bushey-Watford
shuttle, with most stops south of Watford being removed from existing
LM services. *This would make better use of units, as there are quite
a few LM trains that are quite quiet north of Watford but full and
standing south of either there or Harrow.


The problem is that for services north of Watford to run fast to
Euston, they need clear lines, which they won't have if St Albans
services are sitting in the platforms at Bushey, H&W, Wembley, etc.
You might have something if you were to stick a loop or two at those
stations, but that's even more unlikely than my dodgy flyover/under. I
did think about them once though, Bushey has nasty drainage issues in
the subway, so if you took advantage of a rebuild to move the
platforms further south (also enabling you to provide disabled access
via ramps a-la Carpenters Park), then you may have room for a loop or
two before the Bushey arches. At Harrow one loop would be easy by
reusing the old Belmont platform, though you'd need to fit a lift from
the eastern ticket office to the overbridge if you wanted to maintain
the existing disabled access. Two would require quite a rebuild of
most of the platform area to shuffle things around (probably
sacrificing fast line platforms in the process, not to mention that
the proximity of the road bridge's supports would limit your options).
At Wembley there's no chance. If anything were to happen I'd imagine
it'd be easiest to knock through the parcels platforms...but well.
Hmm. Adding platforms at Willesden Junction with loops from the outset
would by comparison be easy

....which is why something extending every other slow DC service on a
40 minute timetable (shame they won't up the DC frequency to 4tph,
that would give a handy 30 minute every-other option) and letting
people connect to the existing AC services makes more sense for me.
That way you get less stopping at H&W/Bushey/etc. leaving more line
capacity for outer AC services.

This kind of thing has already started with some peak services, and is
likely to expand. *Ideal stock for it is to use LM's retained 321s.
If the branch platforms are too short for 8 cars (as I think they
are), one set could be left at Watford while the other one does the
branch - if it can work at Northampton it can work there.


I was under the impression that all the 321s would eventually be on
their way elsewhere.

  #22   Report Post  
Old July 13th 09, 11:44 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default Watford Junction - Shops could be bulldozed for new road


On Jul 13, 9:59*pm, (Neil Williams)
wrote:

[snip]

[1] These days it's a 321, which isn't exactly a super-high-tech unit,
though is newer and more pleasant than a nasty unrefurbed graffitied
Silverlink 313.


The 313's are actually a lot cleaner these days under LO's care. The
even clean the previously filthy seat covers! Of course they haven't
done any refurbishment as such (ala Merseyrail), just removed some of
the seats, but the trains do at least now look as though someone
actually cares about them.
  #23   Report Post  
Old July 14th 09, 12:09 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2006
Posts: 498
Default Watford Junction - Shops could be bulldozed for new road

On Jul 13, 11:41*pm, Jamie Thompson wrote:
On 13 July, 21:52, Andy wrote:

Provision of the passing loop at Bricket Wood would have had nothing
to do with the costs of the units needed to run the service. The class
350s, used by LM, cost a similar amount to the new LO class 378 units,
although it is hard to compare the costs to the train operating
company, as the rental cost of units seems to be much harder to find.
What would be cheaper is for LM to run the branch with the class 321s
that they are retaining, rather than switching to any form of new
unit.


I was led to believe that the point of the loop would be that you
could have two trains on the line at once, and due to them needing to
be 377s (or as you suggest 350s - like I say, I don't really care
about the trains themselves!), the economics didn't add up. More
juice, heavier, higher leasing...can't say I remember or indeed ever
knew the details.


Indeed, the loop would allow two trains at once, but there is really
no way to increase the frequency to every 30 mins without a loop. The
old timetable (in immediate post-electrification days) had a train
every 40 mins during the peak, but the time keeping fell off a bit
towards the end of the rush hour and there was a gap in service to
allow for this. Current frequency is a train every 42 mins at the
start of service, then 45 mins for most of the day but 45-50 mins in
the evening peak. The journey takes 16 mins end-to-end which doesn't
leave sufficient turn around times to run a reliable service every 40
mins (this would only allow 4 mins at each end).

On 13 July, 21:59, (Neil Williams)
wrote:





On Mon, 13 Jul 2009 13:25:23 -0700 (PDT), Jamie Thompson


wrote:
Yup, but one of the main reasons the passing loop got deferred is
because one of the franchise commitments that came in when LM took
over was to harmonise their fleet or some such, meaning that the line
can only be worked by a hugely excessive new 377, when a much smaller/
cheaper non-standard unit would suffice ( I believe a Silverlink Metro
unit used to operate the line before the franchise change).


It was a 313[1]. *But IMO it makes no sense to add it to the
incredibly slow DC lines. *Better use of the loop, if built, would be
to attach it to a self-contained AC Euston-Harrow-Bushey-Watford
shuttle, with most stops south of Watford being removed from existing
LM services. *This would make better use of units, as there are quite
a few LM trains that are quite quiet north of Watford but full and
standing south of either there or Harrow.


The problem is that for services north of Watford to run fast to
Euston, they need clear lines, which they won't have if St Albans
services are sitting in the platforms at Bushey, H&W, Wembley, etc.
You might have something if you were to stick a loop or two at those
stations, but that's even more unlikely than my dodgy flyover/under. I
did think about them once though, Bushey has nasty drainage issues in
the subway, so if you took advantage of a rebuild to move the
platforms further south (also enabling you to provide disabled access
via ramps a-la Carpenters Park), then you may have room for a loop or
two before the Bushey arches. At Harrow one loop would be easy by
reusing the old Belmont platform, though you'd need to fit a lift from
the eastern ticket office to the overbridge if you wanted to maintain
the existing disabled access. Two would require quite a rebuild of
most of the platform area to shuffle things around (probably
sacrificing fast line platforms in the process, not to mention that
the proximity of the road bridge's supports would limit your options).
At Wembley there's no chance. If anything were to happen I'd imagine
it'd be easiest to knock through the parcels platforms...but well.
Hmm. Adding platforms at Willesden Junction with loops from the outset
would by comparison be easy


But there is actually plenty of capacity off-peak to do this and
London Midland are planning have these relief services running from
Watford Junction anyway during the peaks anyway. If you look between
17.00 and 18.00 or between 18.00 and 19.00 there are currently 6
trains leaving Euston on the slow lines, add in the Southern service
and there are 7 passenger trains per peak hour leaving London. The
time penalty for the current Harrow / Bushey stoppers is 4 mins to
Watford Junction at non-peak times although often less during the peak
as many trains are Harrow or Bushey not both. For an easy example,
removing the Harrow and Bushey stops from the xx.04 and xx.34 off-peak
services would allow xx.10 and xx.40 services calling at Queens Park,
Wembley (ok the first two are 'extras'), Harrow, Bushey and Watford
Junction to run without impacting on the following service which uses
the slow lines (xx.24 and xx.54). Compared to many other routes out of
London, the WCML slow lines are not at capacity, even allowing for the
freight which runs during the peak. Platform loops don't really add
capacity whilst allowing for a reliable timetable, as there is a very
narrow slot for the fast train to run through whilst the slow is
stopped in the loop.

...which is why something extending every other slow DC service on a
40 minute timetable (shame they won't up the DC frequency to 4tph,
that would give a handy 30 minute every-other option) and letting
people connect to the existing AC services makes more sense for me.
That way you get less stopping at H&W/Bushey/etc. leaving more line
capacity for outer AC services.


But you'll have the same stopping at Harrow and Bushey whatever train
run on the AC lines, as the existing service will have to retain their
calls. Currently the DC services have a 16 min turnaround at Watford
Junction which allows plenty of recovery time (and this is often
used). You would turn this into 4 mins at St. Albans for every other
train, with maybe a couple of mins stand at Watford Junction in each
direction to adsorb late running / power switch over when coming onto
or off the DC lines.

This kind of thing has already started with some peak services, and is
likely to expand. *Ideal stock for it is to use LM's retained 321s.
If the branch platforms are too short for 8 cars (as I think they
are), one set could be left at Watford while the other one does the
branch - if it can work at Northampton it can work there.


I was under the impression that all the 321s would eventually be on
their way elsewhere.


Current plans see 7 x class 321 units retained by LM (unit 411 and 412
have already been repainted in LM livery) and originally it was to be
10.
  #24   Report Post  
Old July 14th 09, 03:59 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 2,796
Default Watford Junction - Shops could be bulldozed for new road

On Mon, 13 Jul 2009 15:41:17 -0700 (PDT), Jamie Thompson
wrote:

The problem is that for services north of Watford to run fast to
Euston, they need clear lines, which they won't have if St Albans
services are sitting in the platforms at Bushey, H&W, Wembley, etc.


This can't be a problem, because LM are already doing it in the height
of the peak. They're just terminating at Watford.

I was under the impression that all the 321s would eventually be on
their way elsewhere.


They will, but not for some time. LM are keeping either 7 or 9 (I
forget) for the foreseeable future.

Neil

--
Neil Williams
Put my first name before the at to reply.
  #25   Report Post  
Old July 14th 09, 11:44 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2009
Posts: 1,018
Default Watford Junction - Shops could be bulldozed for new road

On Mon, 13 Jul 2009 15:41:17 -0700 (PDT), Jamie Thompson
wrote:

I was led to believe that the point of the loop would be that you
could have two trains on the line at once, and due to them needing to
be 377s (or as you suggest 350s - like I say, I don't really care
about the trains themselves!), the economics didn't add up. More
juice, heavier, higher leasing...can't say I remember or indeed ever
knew the details.



If the economics of a loop and new rolling stick "don't add up", let's
see you try to justify the cost of constructing a flyover/flyunder,
which would be orders of magnitude higher!

Should be quite a laugh.



  #26   Report Post  
Old July 14th 09, 12:08 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 48
Default Watford Junction - Shops could be bulldozed for new road

On 14 July, 12:44, Bruce wrote:
On Mon, 13 Jul 2009 15:41:17 -0700 (PDT), Jamie Thompson

wrote:
I was led to believe that the point of the loop would be that you
could have two trains on the line at once, and due to them needing to
be 377s (or as you suggest 350s - like I say, I don't really care
about the trains themselves!), the economics didn't add up. More
juice, heavier, higher leasing...can't say I remember or indeed ever
knew the details.


If the economics of a loop and new rolling stick "don't add up", let's
see you try to justify the cost of constructing a flyover/flyunder,
which would be orders of magnitude higher!

Should be quite a laugh.


I didn't say I could justify it, just that it'd be a useful thing to
have as an investment for the future. Sorry if that's not quite the
laugh you envisioned.
  #27   Report Post  
Old July 14th 09, 12:30 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 48
Default Watford Junction - Shops could be bulldozed for new road

On 14 July, 01:09, Andy wrote:
On Jul 13, 11:41*pm, Jamie Thompson wrote:
Indeed, the loop would allow two trains at once, but there is really
no way to increase the frequency to every 30 mins without a loop. The
old timetable (in immediate post-electrification days) had a train
every 40 mins during the peak, but the time keeping fell off a bit
towards the end of the rush hour and there was a gap in service to
allow for this. Current frequency is a train every 42 mins at the
start of service, then 45 mins for most of the day but 45-50 mins in
the evening peak. The journey takes 16 mins end-to-end which doesn't
leave sufficient turn around times to run a reliable service every 40
mins (this would only allow 4 mins at each end).


Fair enough. The mighty wikipedia says the line speed varies between
40-75mph. Could raising this slightly not give the required layover
time...expensive I know, but we're already well off into fantasyville
here anyway. For the record, I think the loop's a great idea. I
wonder, would having 3 or 4 trains on the branch (you'd need both
termini to have dual platforms or at the very least pre-platform
loops) not work too? Two in motion, and one or two waiting at the
terminus/i for the next to arrive. Plenty of layover time.

But there is actually plenty of capacity off-peak to do this and
London Midland are planning have these relief services running from
Watford Junction anyway during the peaks anyway. If you look between
17.00 and 18.00 or between 18.00 and 19.00 there are currently 6
trains leaving Euston on the slow lines, add in the Southern service
and there are 7 passenger trains per peak hour leaving London. The
time penalty for the current Harrow / Bushey stoppers is 4 mins to
Watford Junction at non-peak times although often less during the peak
as many trains are Harrow or Bushey not both. For an easy example,
removing the Harrow and Bushey stops from the xx.04 and xx.34 off-peak
services would allow xx.10 and xx.40 services calling at Queens Park,
Wembley (ok the first two are 'extras'), Harrow, Bushey and Watford
Junction to run without impacting on the following service which uses
the slow lines (xx.24 and xx.54). Compared to many other routes out of
London, the WCML slow lines are not at capacity, even allowing for the
freight which runs during the peak. Platform loops don't really add
capacity whilst allowing for a reliable timetable, as there is a very
narrow slot for the fast train to run through whilst the slow is
stopped in the loop.


Is it really that hard to hold them to timetable? My main concern
would be the acceleration reducing capacity, but that could be
countered by making the loops longer. The Reason I first thought of
these loops was my experience of standing at Harrow & Wealdstone
during the peak with the platform being crush loaded and trying to
force my way back behind the yellow line when a ex-Bushey non-stopper
shot past. Incredibly dangerous, especially when you don't get the
warnings until the trains already shooting through - if indeed you can
hear them at all due to the crappy PA system. Strikes me that if you
put the platforms on loops the air shockwave would be non-existent and
you'd have less change of having your face ground against the side of
a 90mph train if someone happened to bump you by accident.

Also, it does seem that there is spare capacity, but then I wonder
about several peak gaps in service of half an hour or so (ok, 15
really, but it's 30 if you want to go to Euston rather than Clapham),
which made me wonder if I was missing something.

But you'll have the same stopping at Harrow and Bushey whatever train
run on the AC lines, as the existing service will have to retain their
calls. Currently the DC services have a 16 min turnaround at Watford
Junction which allows plenty of recovery time (and this is often
used). You would turn this into 4 mins at St. Albans for every other
train, with maybe a couple of mins stand at Watford Junction in each
direction to adsorb late running / power switch over when coming onto
or off the DC lines.


Sorry, I thought we were proposing additional calls? - My bad.

Current plans see 7 x class 321 units retained by LM (unit 411 and 412
have already been repainted in LM livery) and originally it was to be
10.


I stand informed and corrected

Another random thought, given the ample capacity on the DC lines, and
with a flyunder and a link to the MML/proposed Radlett freight
terminal, you could increase freight capacity to Wembley yard whilst
(depending on the location of said flyunder), possibly even moving
some freight off the slow lines between Watford and Wembley.
  #28   Report Post  
Old July 14th 09, 01:17 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2009
Posts: 1,018
Default Watford Junction - Shops could be bulldozed for new road

On Tue, 14 Jul 2009 05:08:46 -0700 (PDT), Jamie Thompson
wrote:
On 14 July, 12:44, Bruce wrote:
On Mon, 13 Jul 2009 15:41:17 -0700 (PDT), Jamie Thompson

wrote:
I was led to believe that the point of the loop would be that you
could have two trains on the line at once, and due to them needing to
be 377s (or as you suggest 350s - like I say, I don't really care
about the trains themselves!), the economics didn't add up. More
juice, heavier, higher leasing...can't say I remember or indeed ever
knew the details.


If the economics of a loop and new rolling stick "don't add up", let's
see you try to justify the cost of constructing a flyover/flyunder,
which would be orders of magnitude higher!

Should be quite a laugh.


I didn't say I could justify it, just that it'd be a useful thing to
have as an investment for the future. Sorry if that's not quite the
laugh you envisioned.



On the contrary, it was hilarious!

You appear to have quite a bizarre (mis)understanding of the term
"investment". ;-)

  #29   Report Post  
Old July 14th 09, 01:18 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2009
Posts: 1,018
Default Watford Junction - Shops could be bulldozed for new road

On Tue, 14 Jul 2009 05:30:58 -0700 (PDT), Jamie Thompson
wrote:

Fair enough. The mighty wikipedia says the line speed varies between
40-75mph. Could raising this slightly not give the required layover
time...expensive I know, but we're already well off into fantasyville
here anyway.



Well you might be, but most others here have the sense to see that you
are well and truly in fantasy land.

  #30   Report Post  
Old July 14th 09, 02:05 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 48
Default Watford Junction - Shops could be bulldozed for new road

On 14 July, 14:18, Bruce wrote:
On Tue, 14 Jul 2009 05:30:58 -0700 (PDT), Jamie Thompson

wrote:

Fair enough. The mighty wikipedia says the line speed varies between
40-75mph. Could raising this slightly not give the required layover
time...expensive I know, but we're already well off into fantasyville
here anyway.


Well you might be, but most others here have the sense to see that you
are well and truly in fantasy land.


Umm...trolling by repeating what I just said doesn't make any sense...


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Watford to St Albans tram link could open in 2012 burkey[_2_] London Transport 26 November 8th 10 04:02 PM
BBC - Soho shops make way for Crossrail E27002 London Transport 3 November 19th 09 09:19 PM
BBC - Soho shops make way for Crossrail E27002 London Transport 3 November 17th 09 03:10 PM
Box Signal Box and Junction Road Junction Basil Jet London Transport 0 August 6th 09 01:14 AM
Road layout outside watford junction [email protected][_2_] London Transport 3 November 17th 07 12:08 PM


All times are GMT. The time now is 08:12 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017