  #1   Report Post  
Old December 28th 09, 11:45 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jun 2009
Posts: 400
Default Buckaroo closure


It seems that the Watford - Euston services are suspended between Wealdstone
and Queens Park, even though the Bakerloo is running between Wealdstone and
Stonebridge Park. I don't understand why the Watford trains aren't running
as far as Stonebridge Park.

--
We are the Strasbourg. Referendum is futile.



  #2   Report Post  
Old December 28th 09, 01:18 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2005
Posts: 290
Default Buckaroo closure

"Basil Jet" wrote in message
...

It seems that the Watford - Euston services are suspended between
Wealdstone and Queens Park, even though the Bakerloo is running
between Wealdstone and Stonebridge Park. I don't understand why the
Watford trains aren't running as far as Stonebridge Park.


The only way to reverse at Stonebridge Park is via the LU depot so I
guess the Overground drivers would not be cleared for that route.

Peter Smyth

  #3   Report Post  
Old December 28th 09, 06:29 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 240
Default Buckaroo closure

In message , Peter Smyth
wrote:
The only way to reverse at Stonebridge Park is via the LU depot so I
guess the Overground drivers would not be cleared for that route.


The signalling also requires an LU train description to be in the
appropriate berth on the train describer before a route can be set into
the depot approach roads. While this could be entered by hand, it would
be a pain.

I suspect the reason may be that the power supply switches to
fourth-rail only somewhere on those approach roads, though I don't have
the traction rail gap data to verify it.

--
Clive D.W. Feather | Home:
Mobile: +44 7973 377646 | Web: http://www.davros.org
Please reply to the Reply-To address, which is:
  #4   Report Post  
Old December 29th 09, 12:56 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2006
Posts: 498
Default Buckaroo closure

On Dec 28, 7:29*pm, "Clive D. W. Feather" wrote:
In message , Peter Smyth

wrote:
The only way to reverse at Stonebridge Park is via the LU depot so I
guess the Overground drivers would not be cleared for that route.


The signalling also requires an LU train description to be in the
appropriate berth on the train describer before a route can be set into
the depot approach roads. While this could be entered by hand, it would
be a pain.

I suspect the reason may be that the power supply switches to
fourth-rail only somewhere on those approach roads, though I don't have
the traction rail gap data to verify it.


The reversals at Harrow & Wealdstone seemed to be causing some delays.
In the afternoon (at about 3pm), there was a southbound LO train which
had terminated in platform 2 and there was another north of the
station, beyond the reversing siding, awaiting entry. The Bakerloo
trains seemed to be running at 6 and 14 min intervals (according to
the LDB), with the LO trains (every 20 mins) reversing via the
crossover south of the station in the 14 min gap between Bakerloo
trains.

It seems to me that a better plan would have been to have reversed the
LO trains at Wembley Central, where the reversal doesn't need the
train to be checked empty. (Although I think this needs the ground
frame manned).

Of course, the ideal solution would be to have the reversing siding at
Harrow converted into a through siding (like Newbury Park on the
Central line) which would allow the LO trains to reverse directly from
platform 2 and so allow a ten minute interval on the Bakerloo,
reversing in platform 1.


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
North Harrow closure Geoff Marshall London Transport 2 September 20th 04 11:18 AM
Weekend District/Circle Closure Paul Weaver London Transport 24 April 22nd 04 01:02 PM
Closure of Liverpool Street this morning Nicholas F Hodder London Transport 36 November 8th 03 10:39 AM
Five Day closure of Central Line (was surprised) Thomas Covenant London Transport 1 August 18th 03 08:35 AM
Success of Central Line Closure answer to Track Maintenance CJG London Transport 11 August 7th 03 09:11 PM


All times are GMT. The time now is 08:30 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017