Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
On Jan 25, 6:17*am, "Recliner" wrote:
"Yokel" wrote in message "D7666" wrote in message ... On Jan 23, 10:39 pm, "Peter Masson" wrote: It is already at capacity. Thats why it is getting re-signalled - The idea is to run all Morden trains via Bank, with the Charing Cross branch extended from Kennington to Nine Elms and Battersea. This is said to enable an increased frequency through Central London on both branches. They already do that north of Kennington anyway, except for a few trains in the peaks. The line is at capacity already, *and TBTC will do nothing more than provide a little growth for the line as it is. If they already run all the Morden trains via Bank and all the Charing Cross route terminate at Kennington, then how will extending the Kennington service onward require any extra train paths? *Extra trains, perhaps, as the end-to-end journey on the Charing Cross route will take longer. *But the same number of trains would run between Camden Town and Kennington - they would just run along the extension and back instead of going round the reversing loop. Or have I missed something? Yes, the extra demand that will be stimulated by the extension will funnel more passengers into the already crowded central sections of the line. As the trains won't be longer, more will need to run, hence the need for extra paths (and trains). A complete split at Camden Town would help even more, but that's not practical without a hugely expensive redevelopment of the station. IMHO The Waterloo and City may be a better candidate for extension to Battersea, and perhaps on to Wimbledon. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Battersea Northern Line extension now done with a loan? | London Transport | |||
Northern line extension | London Transport | |||
Unknown Northern Line extension? | London Transport | |||
Northern Line Extension To Battersea | London Transport | |||
Piccadilly line extension to Terminal 5/Heathrow Express extension to T5 | London Transport |