Default MR piece - Northern Line extension?

On Jan 25, 6:17*am, "Recliner" wrote:
"Yokel" wrote in message







"D7666" wrote in message

...
On Jan 23, 10:39 pm, "Peter Masson"
wrote:


It is already at capacity. Thats why it is getting re-signalled -


The idea is to run all Morden trains via Bank, with the Charing Cross
branch
extended from Kennington to Nine Elms and Battersea. This is said to
enable
an increased frequency through Central London on both branches.


They already do that north of Kennington anyway, except for a few
trains in the peaks. The line is at capacity already, *and TBTC will
do nothing more than provide a little growth for the line as it is.


If they already run all the Morden trains via Bank and all the
Charing Cross route terminate at Kennington, then how will extending
the Kennington service onward require any extra train paths? *Extra
trains, perhaps, as the end-to-end journey on the Charing Cross route
will take longer. *But the same number of trains would run between
Camden Town and Kennington - they would just run along the extension
and back instead of going round the reversing loop.


Or have I missed something?


Yes, the extra demand that will be stimulated by the extension will
funnel more passengers into the already crowded central sections of the
line. As the trains won't be longer, more will need to run, hence the
need for extra paths (and trains). A complete split at Camden Town would
help even more, but that's not practical without a hugely expensive
redevelopment of the station.


IMHO The Waterloo and City may be a better candidate for extension to
Battersea, and perhaps on to Wimbledon.

  #2   Report Post  
Old January 25th 10, 03:26 PM posted to uk.railway,misc.transport.urban-transit,uk.transport.london
MIG MIG is offline
external usenet poster
 
First recorded activity at LondonBanter: Jun 2004
Posts: 3,154
Default MR piece - Northern Line extension?

On 25 Jan, 16:07, E27002 wrote:
On Jan 25, 6:17*am, "Recliner" wrote:





"Yokel" wrote in message




"D7666" wrote in message
....
On Jan 23, 10:39 pm, "Peter Masson"
wrote:


It is already at capacity. Thats why it is getting re-signalled -


The idea is to run all Morden trains via Bank, with the Charing Cross
branch
extended from Kennington to Nine Elms and Battersea. This is said to
enable
an increased frequency through Central London on both branches.


They already do that north of Kennington anyway, except for a few
trains in the peaks. The line is at capacity already, *and TBTC will
do nothing more than provide a little growth for the line as it is.


If they already run all the Morden trains via Bank and all the
Charing Cross route terminate at Kennington, then how will extending
the Kennington service onward require any extra train paths? *Extra
trains, perhaps, as the end-to-end journey on the Charing Cross route
will take longer. *But the same number of trains would run between
Camden Town and Kennington - they would just run along the extension
and back instead of going round the reversing loop.


Or have I missed something?


Yes, the extra demand that will be stimulated by the extension will
funnel more passengers into the already crowded central sections of the
line. As the trains won't be longer, more will need to run, hence the
need for extra paths (and trains). A complete split at Camden Town would
help even more, but that's not practical without a hugely expensive
redevelopment of the station.


IMHO The Waterloo and City may be a better candidate for extension to
Battersea, and perhaps on to Wimbledon.


Maybe operationally, but physically it comes to the surface at
Waterloo facing southeast. The Northern Line idea probably came out
of the fact that it would be relatively straightforward to branch off
from the Kennington loop.
  #4   Report Post  
Old January 26th 10, 03:38 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 346
Default MR piece - Northern Line extension?

On 26 Jan, 00:40, wrote:
Maybe operationally, but physically it comes to the surface at
Waterloo facing southeast. *The Northern Line idea probably came out
of the fact that it would be relatively straightforward to branch off
from the Kennington loop.


Having seen some details from the promoters at a transport conference last
year I appreciate that is exactly the reason for preferring the Northern
Line, as well as the ability to fit within line capacity by diverting the
West End service there.

--
Colin Rosenstiel


Diverting implies that its being diverted from somewhere else. But it
isn't. Kennington is the terminus.
  #5   Report Post  
Old January 26th 10, 03:45 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 346
Default MR piece - Northern Line extension?

On 26 Jan, 00:40, wrote:
Maybe operationally, but physically it comes to the surface at
Waterloo facing southeast. *The Northern Line idea probably came out
of the fact that it would be relatively straightforward to branch off
from the Kennington loop.


Having seen some details from the promoters at a transport conference last
year I appreciate that is exactly the reason for preferring the Northern
Line, as well as the ability to fit within line capacity by diverting the
West End service there.


--
Colin Rosenstiel


If you look at a map of S london, you'll realise the Northern Line has
to head south east, not south west.

The recent bakerloo extension survey (as well as the original plans)
has it headed East SouthEast, to New Cross and Lewisham. The Victoria
line is headed SE from brixton, and extension plans have it heading to
Herne Hill as a minimum.

That leaves a huge area - around camberwell - utterly without any rail
connection, and certainly without one that's useful for getting into
town.

The only way to plug the gap is for the northern line to go to
camberwell. Which means extending the west end branch that way.

Taking the northern line to battersea really messes that possibility
up, and essentially precludes it ever occurring.


  #6   Report Post  
Old January 26th 10, 05:00 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jun 2009
Posts: 400
Default MR piece - Northern Line extension?

lonelytraveller wrote:

That leaves a huge area - around camberwell - utterly without any rail
connection, and certainly without one that's useful for getting into
town.

The only way to plug the gap is for the northern line to go to
camberwell.


The fact that Camberwell contains a road called "Camberwell Station Road"
shows the flaw in that argument.

Taking the northern line to battersea really messes that possibility
up, and essentially precludes it ever occurring.


No - sending half the trains to Battersea and half to Camberwell probably
matches supply with demand better than a single extension.

--
We are the Strasbourg. Referendum is futile.


  #7   Report Post  
Old January 26th 10, 03:37 PM posted to uk.railway,misc.transport.urban-transit,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 346
Default MR piece - Northern Line extension?

On 25 Jan, 16:26, MIG wrote:
On 25 Jan, 16:07, E27002 wrote:



On Jan 25, 6:17*am, "Recliner" wrote:


"Yokel" wrote in message




"D7666" wrote in message
...
On Jan 23, 10:39 pm, "Peter Masson"
wrote:


It is already at capacity. Thats why it is getting re-signalled -


The idea is to run all Morden trains via Bank, with the Charing Cross
branch
extended from Kennington to Nine Elms and Battersea. This is said to
enable
an increased frequency through Central London on both branches.


They already do that north of Kennington anyway, except for a few
trains in the peaks. The line is at capacity already, *and TBTC will
do nothing more than provide a little growth for the line as it is..


If they already run all the Morden trains via Bank and all the
Charing Cross route terminate at Kennington, then how will extending
the Kennington service onward require any extra train paths? *Extra
trains, perhaps, as the end-to-end journey on the Charing Cross route
will take longer. *But the same number of trains would run between
Camden Town and Kennington - they would just run along the extension
and back instead of going round the reversing loop.


Or have I missed something?


Yes, the extra demand that will be stimulated by the extension will
funnel more passengers into the already crowded central sections of the
line. As the trains won't be longer, more will need to run, hence the
need for extra paths (and trains). A complete split at Camden Town would
help even more, but that's not practical without a hugely expensive
redevelopment of the station.


IMHO The Waterloo and City may be a better candidate for extension to
Battersea, and perhaps on to Wimbledon.


Maybe operationally, but physically it comes to the surface at
Waterloo facing southeast. *The Northern Line idea probably came out
of the fact that it would be relatively straightforward to branch off
from the Kennington loop.


But at Waterloo, there's a large expanse of open ground in front of
it, so there's ample room to turn south. And there are conveniently
long southward roads adjacent to the railway, suitable for cut and
cover, that connect that open ground to vauxhall.

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Battersea Northern Line extension now done with a loan? Someone Somewhere London Transport 68 November 11th 13 08:56 PM
Northern line extension [email protected] London Transport 10 July 8th 13 09:09 AM
Unknown Northern Line extension? Someone Somewhere London Transport 1 May 2nd 13 10:23 AM
Northern Line Extension To Battersea Paul London Transport 7 May 24th 11 06:36 PM
Piccadilly line extension to Terminal 5/Heathrow Express extension to T5 Martin Whelton London Transport 43 May 27th 04 08:40 AM


All times are GMT. The time now is 03:02 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017