Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#8
![]() |
|||
|
|||
![]() "Basil Jet" wrote in message ... lonelytraveller wrote: That leaves a huge area - around camberwell - utterly without any rail connection, and certainly without one that's useful for getting into town. The only way to plug the gap is for the northern line to go to camberwell. The fact that Camberwell contains a road called "Camberwell Station Road" shows the flaw in that argument. Taking the northern line to battersea really messes that possibility up, and essentially precludes it ever occurring. No - sending half the trains to Battersea and half to Camberwell probably matches supply with demand better than a single extension. -- We are the Strasbourg. Referendum is futile. I'm missing something. Not so many years ago the Northern Line was a joke. That was partly about the state of the physical plant but also about the amount of traffic on offer that couldn't fit through the system. So they did something about the plant and now the situation is better but by no means perfect and we're talking about increasing the load again? How much of the traffic from Battersea will want to go to the West End? How much will be transferring at Kennington? Probably an imponderable at the moment but there has to be some and I suspect a bit more than a small amount. Like I say, I must be missing something. The Northern Line feels like it's been chosen simply because it's the cheapest solution. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Battersea Northern Line extension now done with a loan? | London Transport | |||
Northern line extension | London Transport | |||
Unknown Northern Line extension? | London Transport | |||
Northern Line Extension To Battersea | London Transport | |||
Piccadilly line extension to Terminal 5/Heathrow Express extension to T5 | London Transport |