Default Crossrail - Transport Secretary's statement

....during his visit to Canary Wharf station site.

Hammond said: "The Government is committed to this project."
He added: "We have no plans to reduce its scope. We want this project to be
delivered in its entirety," he said. But he added that the Government wanted
to ensure that Crossrail was delivered "with maximum value for the
taxpayer".

Worth watching the whole of the BBC video included on the webpage, the
interviewer seems to cover most of the obvious questions ...

http://news.bbc.co.uk/1/hi/england/london/10323035.stm

Paul S






  #2   Report Post  
Old June 15th 10, 06:22 PM posted to uk.railway,misc.transport.urban-transit,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2009
Posts: 209
Default Crossrail - Transport Secretary's statement

On Jun 15, 11:10*am, "Paul Scott"
wrote:
...during his visit to Canary Wharf station site.

Hammond said: "The Government is committed to this project."
He added: "We have no plans to reduce its scope. We want this project to be
delivered in its entirety," he said. But he added that the Government wanted
to ensure that Crossrail was delivered "with maximum value for the
taxpayer".

Worth watching the whole of the BBC video included on the webpage, the
interviewer seems to cover most of the obvious questions ...

http://news.bbc.co.uk/1/hi/england/london/10323035.stm

Thank you for posting. This pronouncement has me completely confused
as to the likely scope of Crossrail.

  #3   Report Post  
Old June 15th 10, 06:30 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default Crossrail - Transport Secretary's statement



"E27002" wrote in message
...
On Jun 15, 11:10 am, "Paul Scott"
wrote:
...during his visit to Canary Wharf station site.

Hammond said: "The Government is committed to this project."
He added: "We have no plans to reduce its scope. We want this project to
be
delivered in its entirety," he said. But he added that the Government
wanted
to ensure that Crossrail was delivered "with maximum value for the
taxpayer".

Worth watching the whole of the BBC video included on the webpage, the
interviewer seems to cover most of the obvious questions ...

http://news.bbc.co.uk/1/hi/england/london/10323035.stm

Thank you for posting. This pronouncement has me completely confused
as to the likely scope of Crossrail.


Maidenhead and Heathrow to Shenfield and Abbeywood, as per the enabling Act,
I'd have thought. Anywhere else, such as Reading, is just froth...

Paul S

  #4   Report Post  
Old June 15th 10, 07:06 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default Crossrail - Transport Secretary's statement

On Jun 15, 7:10*pm, "Paul Scott"
wrote:
...during his visit to Canary Wharf station site.

Hammond said: "The Government is committed to this project."
He added: "We have no plans to reduce its scope. We want this project to be
delivered in its entirety," he said. But he added that the Government wanted
to ensure that Crossrail was delivered "with maximum value for the
taxpayer".


Which I suppose could be interpreted as 'we want the full scheme but
we want to pay less for it' - likewise, it could also be interpreted
as 'we want the full scheme but we definitely don't want any cost
overruns on it'.


Worth watching the whole of the BBC video included on the webpage, the
interviewer seems to cover most of the obvious questions ...

http://news.bbc.co.uk/1/hi/england/london/10323035.stm


Yes, a good interview - UIVMM the (unseen) questioner is Tom Edwards,
BBC London's transport correspondent, who seems pretty on the ball -
he also has a blog on transport issues in London called 'Mind the Gap'
he
http://www.bbc.co.uk/blogs/mindthegap/
  #5   Report Post  
Old June 15th 10, 07:26 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default Crossrail - Transport Secretary's statement


On Jun 15, 8:01*pm, Paul Corfield wrote:

On Tue, 15 Jun 2010 19:10:36 +0100, "Paul Scott"
wrote:
...during his visit to Canary Wharf station site.


Hammond said: "The Government is committed to this project."
He added: "We have no plans to reduce its scope. We want this project to be
delivered in its entirety," he said. But he added that the Government wanted
to ensure that Crossrail was delivered "with maximum value for the
taxpayer".


Worth watching the whole of the BBC video included on the webpage, the
interviewer seems to cover most of the obvious questions ...


http://news.bbc.co.uk/1/hi/england/london/10323035.stm


Thanks for posting that. On the face of it it is fairly positive and
completely at odds with some scandalous rumour I heard today
(and no I'm not sharing it). [...]


Bozza has been digging his pencils and protractor out, in a bid to
'assist' the Crossrail team?

[...] However there is the nasty politicians' phrase of "we
have no plans". This can, of course, change at the drop of a hat and the
sudden presentation of a plan that changes everything!


Given the 'emergency' budget is coming up next Tuesday, it does seem
unlikely that the SoS would be mouthing off about Crossrail without
being fairly certain that the project was still on. I'm minded to
think that some of the earlier chit chat about de-scoping / cutting
back Crossrail may have emanated from the Crossrail team themselves,
or those close to them - present the new team at the DfT (and indeed
the Treasury) with a whole menu of possible substantive cuts to the
project, then gently explain the consequences of said cuts, the
inference being that actually opting for any such cut would seriously
curtail significant benefits derived from the project and hence would
be a daft thing to do. Plus of course there's the whole complex
funding structure which is now in place which is based on the full
project (rather than a cut back version which isn't what was agreed
to).

I wonder if Hammond's reticence about the timetable might possibly
point to something that 'Bruce' suggested recently as a potential
money saver - that of slower tunnelling and fewer TBMs ((or indeed
just one of them)...


  #6   Report Post  
Old June 15th 10, 07:50 PM posted to uk.railway,misc.transport.urban-transit,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2009
Posts: 209
Default Crossrail - Transport Secretary's statement

On Jun 15, 12:26*pm, Mizter T wrote:
On Jun 15, 8:01*pm, Paul Corfield wrote:





On Tue, 15 Jun 2010 19:10:36 +0100, "Paul Scott"
wrote:
...during his visit to Canary Wharf station site.


Hammond said: "The Government is committed to this project."
He added: "We have no plans to reduce its scope. We want this project to be
delivered in its entirety," he said. But he added that the Government wanted
to ensure that Crossrail was delivered "with maximum value for the
taxpayer".


Worth watching the whole of the BBC video included on the webpage, the
interviewer seems to cover most of the obvious questions ...


http://news.bbc.co.uk/1/hi/england/london/10323035.stm


Thanks for posting that. On the face of it it is fairly positive and
completely at odds with some scandalous rumour I heard today
(and no I'm not sharing it). [...]


Bozza has been digging his pencils and protractor out, in a bid to
'assist' the Crossrail team?

[...] However there is the nasty politicians' phrase of "we
have no plans". This can, of course, change at the drop of a hat and the
sudden presentation of a plan that changes everything!


Given the 'emergency' budget is coming up next Tuesday, it does seem
unlikely that the SoS would be mouthing off about Crossrail without
being fairly certain that the project was still on.


This is starting to sound like good news for Crossrail. This is the
correct thing to do. Crossrail and Thameslink n000 are the two
projects that should survive IMHO.

I'm minded to
think that some of the earlier chit chat about de-scoping / cutting
back Crossrail may have emanated from the Crossrail team themselves,
or those close to them - present the new team at the DfT (and indeed
the Treasury) with a whole menu of possible substantive cuts to the
project, then gently explain the consequences of said cuts, the
inference being that actually opting for any such cut would seriously
curtail significant benefits derived from the project and hence would
be a daft thing to do. Plus of course there's the whole complex
funding structure which is now in place which is based on the full
project (rather than a cut back version which isn't what was agreed
to).

I wonder if Hammond's reticence about the timetable might possibly
point to something that 'Bruce' suggested recently as a potential
money saver - that of slower tunnelling and fewer TBMs ((or indeed
just one of them)...


Two might make sense. Crossrail would not come into its own until
there is a complete economic recovery. That is likely to be some
years away. OTOH using one TBM would just be plain silly. Two is the
minimum sensible IMHO.
  #7   Report Post  
Old June 15th 10, 07:52 PM posted to uk.railway,misc.transport.urban-transit,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2009
Posts: 209
Default Crossrail - Transport Secretary's statement

On Jun 15, 12:06*pm, Mizter T wrote:
On Jun 15, 7:10*pm, "Paul Scott"
wrote:

...during his visit to Canary Wharf station site.


Hammond said: "The Government is committed to this project."
He added: "We have no plans to reduce its scope. We want this project to be
delivered in its entirety," he said. But he added that the Government wanted
to ensure that Crossrail was delivered "with maximum value for the
taxpayer".


Which I suppose could be interpreted as 'we want the full scheme but
we want to pay less for it' - likewise, it could also be interpreted
as 'we want the full scheme but we definitely don't want any cost
overruns on it'.



Worth watching the whole of the BBC video included on the webpage, the
interviewer seems to cover most of the obvious questions ...


http://news.bbc.co.uk/1/hi/england/london/10323035.stm


Yes, a good interview - UIVMM the (unseen) questioner is Tom Edwards,
BBC London's transport correspondent, who seems pretty on the ball -
he also has a blog on transport issues in London called 'Mind the Gap'
he
http://www.bbc.co.uk/blogs/mindthegap/


From what I can tell, from afar, BBC London seems to have found itself
a worthwhile role these days. I remember the early days of BBC Radio
London in the 1970s. It really seemed to struggle.
  #8   Report Post  
Old June 15th 10, 07:57 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2009
Posts: 283
Default Crossrail - Transport Secretary's statement


"Paul Scott" wrote in message
...


"E27002" wrote in message
...
On Jun 15, 11:10 am, "Paul Scott"
wrote:
...during his visit to Canary Wharf station site.

Hammond said: "The Government is committed to this project."
He added: "We have no plans to reduce its scope. We want this project to
be
delivered in its entirety," he said. But he added that the Government
wanted
to ensure that Crossrail was delivered "with maximum value for the
taxpayer".

Worth watching the whole of the BBC video included on the webpage, the
interviewer seems to cover most of the obvious questions ...

http://news.bbc.co.uk/1/hi/england/london/10323035.stm

Thank you for posting. This pronouncement has me completely confused
as to the likely scope of Crossrail.


Maidenhead and Heathrow to Shenfield and Abbeywood, as per the enabling
Act, I'd have thought. Anywhere else, such as Reading, is just froth...


Extension to Reading will cost nothing once the station has been rebuilt and
GWR electrified

tim



  #9   Report Post  
Old June 15th 10, 08:11 PM posted to uk.railway,misc.transport.urban-transit,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2006
Posts: 498
Default Crossrail - Transport Secretary's statement

On Jun 15, 8:50*pm, E27002 wrote:
On Jun 15, 12:26*pm, Mizter T wrote:





On Jun 15, 8:01*pm, Paul Corfield wrote:


On Tue, 15 Jun 2010 19:10:36 +0100, "Paul Scott"
wrote:
...during his visit to Canary Wharf station site.


Hammond said: "The Government is committed to this project."
He added: "We have no plans to reduce its scope. We want this project to be
delivered in its entirety," he said. But he added that the Government wanted
to ensure that Crossrail was delivered "with maximum value for the
taxpayer".


Worth watching the whole of the BBC video included on the webpage, the
interviewer seems to cover most of the obvious questions ...


http://news.bbc.co.uk/1/hi/england/london/10323035.stm


Thanks for posting that. On the face of it it is fairly positive and
completely at odds with some scandalous rumour I heard today
(and no I'm not sharing it). [...]


Bozza has been digging his pencils and protractor out, in a bid to
'assist' the Crossrail team?


[...] However there is the nasty politicians' phrase of "we
have no plans". This can, of course, change at the drop of a hat and the
sudden presentation of a plan that changes everything!


Given the 'emergency' budget is coming up next Tuesday, it does seem
unlikely that the SoS would be mouthing off about Crossrail without
being fairly certain that the project was still on.


This is starting to sound like good news for Crossrail. *This is the
correct thing to do. *Crossrail and Thameslink n000 are the two
projects that should survive IMHO.



I'm minded to
think that some of the earlier chit chat about de-scoping / cutting
back Crossrail may have emanated from the Crossrail team themselves,
or those close to them - present the new team at the DfT (and indeed
the Treasury) with a whole menu of possible substantive cuts to the
project, then gently explain the consequences of said cuts, the
inference being that actually opting for any such cut would seriously
curtail significant benefits derived from the project and hence would
be a daft thing to do. Plus of course there's the whole complex
funding structure which is now in place which is based on the full
project (rather than a cut back version which isn't what was agreed
to).


I wonder if Hammond's reticence about the timetable might possibly
point to something that 'Bruce' suggested recently as a potential
money saver - that of slower tunnelling and fewer TBMs ((or indeed
just one of them)...


Two might make sense. *Crossrail would not come into its own until
there is a complete economic recovery. *That is likely to be some
years away. *OTOH using one TBM would just be plain silly. *Two is the
minimum sensible IMHO.


Well, as Crossrail isn't due to open until 2017 even without delays;
it's most likely that the economy will have sufficiently recovered to
use the capacity that will be provided.
  #10   Report Post  
Old June 15th 10, 08:14 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2006
Posts: 498
Default Crossrail - Transport Secretary's statement

On Jun 15, 8:57*pm, "tim...." wrote:
"Paul Scott" wrote in message

...







"E27002" wrote in message
....
On Jun 15, 11:10 am, "Paul Scott"
wrote:
...during his visit to Canary Wharf station site.


Hammond said: "The Government is committed to this project."
He added: "We have no plans to reduce its scope. We want this project to
be
delivered in its entirety," he said. But he added that the Government
wanted
to ensure that Crossrail was delivered "with maximum value for the
taxpayer".


Worth watching the whole of the BBC video included on the webpage, the
interviewer seems to cover most of the obvious questions ...


http://news.bbc.co.uk/1/hi/england/london/10323035.stm


Thank you for posting. *This pronouncement has me completely confused
as to the likely scope of Crossrail.


Maidenhead and Heathrow to Shenfield and Abbeywood, as per the enabling
Act, I'd have thought. *Anywhere else, such as Reading, is just froth....


Extension to Reading will cost nothing once the station has been rebuilt and
GWR electrified


Except for the extra Crossrail rolling stock needed to run the extra
twelve(ish) miles in each direction.


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Transport Secretary vows to finish Crossrail Paul Scott London Transport 85 May 24th 10 09:07 PM
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] E27002 London Transport 2 May 21st 10 06:13 PM
Thameslink 2012 (Statement of Case) John Rowland London Transport 16 March 21st 05 07:07 AM
No statement for Crossrail scheme Richard Stow London Transport 4 July 14th 04 02:00 PM


All times are GMT. The time now is 11:04 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017