London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old June 26th 10, 08:51 AM posted to uk.transport.london,uk.railway
CJB CJB is offline
external usenet poster
 
First recorded activity at LondonBanter: Jun 2007
Posts: 275
Default Cirlce Line Reverts to Circle / New Metropolitan Stock

Crossrail work closes section of Circle line for three weeks
Ross Lydall
25.06.10

http://www.thisislondon.co.uk/standa...three-weeks.do

Passengers on the Circle line face more upheaval in the summer during
a three-week part-closure.

Building work at Paddington station for Crossrail means Hammersmith
and City platforms will be closed for safety reasons.

Hammersmith and City and Circle line services, [the latter of which]
which were extended to Hammersmith in December, will be suspended
between Hammersmith and Edgware Road from July 24 to August 15.

This will return the Circle line, which carries 218,000 passengers on
weekdays, back to its old layout of a full circle, clockwise and
counter-clockwise, rather than the "lasso line" that saw trains
terminate at Edgware Road.

Hammersmith and City services will operate only between Edgware Road
and Whitechapel rather than to Barking. Rail replacement services will
operate between Hammersmith and Edgware Road. The [separate]
Piccadilly [and District] line[s] will still serve Hammersmith.

The Crossrail works at Paddington involve removing a disused taxi ramp
and canopy above the Hammersmith and City platforms. It is not safe to
carry out the work while trains run below. TfL says it will take
advantage of the closure to carry out essential upgrades that would
otherwise have required weekend closures.

The work includes platform lengthening to accommodate new air-
conditioned trains. They are in service on the East London line and
London Overground, and will start running on the Metropolitan line in
weeks.

=========

Does this last mean the new ELL cattle trains are coming to all Met.
and H&C lines? Being longer will they fit at all stations? Its easy
enough to lengthen Paddington H&C platforms, but what about the
underground stations like Edgeware Road etc? And what about
lengthening the stations between Hammersmith and Paddington H&C.?

=========
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Metropolitan District Railway Early Stock Richard Cardy London Transport 1 October 25th 14 08:52 AM
Metropolitan A stock running and last service Walter Briscoe London Transport 3 September 26th 12 08:30 PM
New Connection Watford Triangle - Metropolitan Line Matthew P Jones London Transport 16 May 8th 07 06:01 PM
The new service pattern on the Circle and H&C lines Fig London Transport 72 February 19th 07 11:44 PM
Metropolitan T stock Marratxi London Transport 3 October 20th 04 11:04 PM


All times are GMT. The time now is 12:57 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017