Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Crossrail work closes section of Circle line for three weeks
Ross Lydall 25.06.10 http://www.thisislondon.co.uk/standa...three-weeks.do Passengers on the Circle line face more upheaval in the summer during a three-week part-closure. Building work at Paddington station for Crossrail means Hammersmith and City platforms will be closed for safety reasons. Hammersmith and City and Circle line services, [the latter of which] which were extended to Hammersmith in December, will be suspended between Hammersmith and Edgware Road from July 24 to August 15. This will return the Circle line, which carries 218,000 passengers on weekdays, back to its old layout of a full circle, clockwise and counter-clockwise, rather than the "lasso line" that saw trains terminate at Edgware Road. Hammersmith and City services will operate only between Edgware Road and Whitechapel rather than to Barking. Rail replacement services will operate between Hammersmith and Edgware Road. The [separate] Piccadilly [and District] line[s] will still serve Hammersmith. The Crossrail works at Paddington involve removing a disused taxi ramp and canopy above the Hammersmith and City platforms. It is not safe to carry out the work while trains run below. TfL says it will take advantage of the closure to carry out essential upgrades that would otherwise have required weekend closures. The work includes platform lengthening to accommodate new air- conditioned trains. They are in service on the East London line and London Overground, and will start running on the Metropolitan line in weeks. ========= Does this last mean the new ELL cattle trains are coming to all Met. and H&C lines? Being longer will they fit at all stations? Its easy enough to lengthen Paddington H&C platforms, but what about the underground stations like Edgeware Road etc? And what about lengthening the stations between Hammersmith and Paddington H&C.? ========= |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Metropolitan District Railway Early Stock | London Transport | |||
Metropolitan A stock running and last service | London Transport | |||
New Connection Watford Triangle - Metropolitan Line | London Transport | |||
The new service pattern on the Circle and H&C lines | London Transport | |||
Metropolitan T stock | London Transport |