Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#9
![]() |
|||
|
|||
![]()
On 3 Aug, 09:50, Tristan Miller wrote:
Greetings. In article ,Dr. Sunil wrote: As of this morning, a lot of the clutter and barricades (platform side) had been removed from the new Central westbound platform (3a), though the concourse accesses were still blocked off by hoardings. Anyone know when it will open? I noticed this as well. *Am I correct in assuming that this will be part of a Spanish platform system? *If so, will either of the platforms be exclusively for ingress or egress? *Or will one or both platform afford both embarkation and disembarkation? Regards, Tristan -- * *_ * _V.-o * * * *Tristan Miller * * * * * *Space is limited */ |`-' -=-=-=-=-=-=-=-=-=-=-=-=-=-=- * *In a haiku, so it's hard (7_\\ *http://www.nothingisreal.com/* *To finish what you I think the idea is to have one side ingress-only and vice versa. Not sure which side though! There is a cross-platform interchange to consider too (platform 5 for Liverpool Street). |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
New Central Line platform at Stratford | London Transport | |||
Stratford Regional-Stratford Intl on DLR | London Transport | |||
Stratford platform changes | London Transport | |||
Stratford platform widening | London Transport | |||
No platform adverts at St Paul's | London Transport |