Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]()
From the 23rd Dec-5th Jan (early hours) no Thameslink services operating due
to engineering works. Not sure what they are doing. What also did not help was no South Central trains calling at Clapham Junction just after the Xmas days. Also due to engineering works. Well more fun for Clapham Junction this weekend (SWT services) with work going on at Clapham Junction with trains using Windsor lines. For three months. Not sure what work is being carried out. "Marcus Fox" wrote in message ... Friday 2nd of January - do they have engineering works or something as services don't seem to be running (northbound) through to Kings Cross when I check the timetable online. How much extra time will I have to add on to my journey if I have to go to Victoria instead and take the tube? I know there are timetables online, but they don't hold the tube times and add on way to much time for the connection. Marcus --- Outgoing mail is certified Virus Free. Checked by AVG anti-virus system (http://www.grisoft.com). Version: 6.0.558 / Virus Database: 350 - Release Date: 02/01/2004 |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Exciting news on Thameslink 2000 (now "Thameslink Project") | London Transport |