Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#2
![]() |
|||
|
|||
![]() "Luap" wrote This trackwork has been in place on both sides for a few weeks. I presume it won't be connected until much closer to the start of services to Peterborough and Cambridge (King's Lynn?), which have for a long time been planned for something like 2018, when London Bridge (with the new Borough viaduct) and the Bermondsey and St John's dive- under and fly-over work are all completed. AIUI the new Thameslink stock is going to be maintained at a new depot at Hornsey - so the connection will be needed as soon as the new stock starts arriving. Not yet, but well before 2018. Peter |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Box Signal Box and Junction Road Junction | London Transport | |||
Surbiton - odd trackwork | London Transport | |||
Bakerloo to Watford Junction | London Transport | |||
GNER train waiting on M1 Junction 10 | London Transport | |||
Box Junction Penalty | London Transport |