London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #14   Report Post  
Old August 23rd 12, 01:13 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Default London Overground Extension To Clapham Junction

On Thu, 23 Aug 2012 14:01:35 +0100
Paul Corfield wrote:
Even the most automated system will have a turnround time of about 30
seconds. I can't think of a system anywhere that runs to that sort of
headway as platform dwell times to allow for door cycle times and


I didn't mean the same train to go out and come in - i meant another train
already there waiting to leave as soon as one pulls in. God knows they
managed it at arnos grove enough in the past with a cockfosters train
leaving 10 seconds before an arnos grove terminator opened its doors.

B2003

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Earlsfield and Clapham Junction today Neillw001 London Transport 4 November 27th 05 06:50 PM
Clapham Junction [email protected] London Transport 7 April 18th 05 11:46 AM
Clapham Junction yesterday? Steve M London Transport 1 April 5th 05 12:04 PM
Clapham Junction Vernon London Transport 6 February 25th 05 08:57 AM
Network rail & Clapham Junction John London Transport 5 October 4th 03 07:58 AM


All times are GMT. The time now is 02:47 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017