Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]()
On 10 Dec, 12:59, "Richard J." wrote:
wrote on 10 December 2012 12:34:47 ... On Mon, 10 Dec 2012 12:26:39 -0000 "Peter Masson" wrote: Boltar wrote I'm sorry but terminating the JLE at stratford was down to nothing more than money or lack thereof, don't pretend there was any great plan. The motivations for the JLE route were serving Canary Wharf from Waterloo, serving Canary Wharf from Stratford (DLR did not have enough capacity), the The DLR had and has plenty of capacity mainly because it has a much more frequent service. Not true. *The Jubilee from Stratford to Canary Wharf has 24 tph in the peaks; the DLR from Stratford to Canary Wharf has 10 tph with lower-capacity trains, and is limited by part of the route being single-track. The NLL could have been upgraded for longer, more frequent trains and diverted under the river. An Interchange with a Jubilee extension to Thamsmead would have been entirely possible. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Northern Line to Battersea Power Station | London Transport | |||
Northern Line Extension To Battersea | London Transport | |||
Northern line to battersea | London Transport | |||
Who owns the CC western extension cameras and poles, and what will be done with them? | London Transport | |||
Sleepless ? ? Need a Loan ?? | London Transport |