Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#5
|
|||
|
|||
NB4L production buses
Paul Corfield wrote in
: His [Boris's] first term promise to deliver new orbital bus services was killed off on cost grounds after the X26 trial. Do you mean that the X26 trial was regarded as unsuccessful? Every time I use it, it seems pretty busy - often with standing passengers between Sutton and Kingston or beyond. Is the 30 minute frequency still regarded as a trial? Peter -- || Peter CS ~ Epsom ~ UK || |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Conductors axed from NB4L/New Routemaster/Boris Bus | London Transport | |||
The first D78 Production Refurb | London Transport |