London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #5   Report Post  
Old July 15th 13, 01:24 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2012
Posts: 21
Default NB4L production buses

Paul Corfield wrote in
:

His [Boris's] first term promise to deliver new orbital bus services
was killed off on cost grounds after the X26 trial.


Do you mean that the X26 trial was regarded as unsuccessful? Every time
I use it, it seems pretty busy - often with standing passengers between
Sutton and Kingston or beyond. Is the 30 minute frequency still regarded as
a trial?

Peter

--
|| Peter CS ~ Epsom ~ UK ||


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Conductors axed from NB4L/New Routemaster/Boris Bus Someone Somewhere London Transport 111 July 21st 16 10:19 PM
The first D78 Production Refurb Bradley Chapman London Transport 0 October 7th 04 11:15 AM


All times are GMT. The time now is 06:16 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017