Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
|
|||
|
|||
Goblin electrification
.... the timescale was rumoured to be slipping, according to Modern
Railways, but the contract has now been let. http://www.railtechnologymagazine.co...orewrite=false I had no idea that Barking platform one was not electrified! Won't it become disused when the Barking Reach extension is built? |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
GOBLIN: FURTHER ELECTRIFICATION WORK. | London Transport | |||
Goblin to close for Electrification work | London Transport | |||
Goblin electrification | London Transport | |||
Goblin electrification | London Transport | |||
South Tottenham and GOBLIN electrification | London Transport |