Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#4
|
|||
|
|||
Goblin electrification
In article ,
Recliner wrote: [the goblin] Are the platforms already long enough for four-car trains? No. Most stations that used to have longer platforms have had the length beyond two car closed. This would be easy to fix - repoint the brickwork, repaint all the things, etc. But South Tottenham would be more challenging - extending westwards is tricky becuase there's a bridge over the A10 that way; extending eastwards is tricky becuae there's a junction that way. Google maps will give you a picture - literally. Cheers, Mike -- Mike Bristow |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
GOBLIN: FURTHER ELECTRIFICATION WORK. | London Transport | |||
Goblin to close for Electrification work | London Transport | |||
Goblin electrification | London Transport | |||
Goblin electrification | London Transport | |||
South Tottenham and GOBLIN electrification | London Transport |