London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #4   Report Post  
Old October 1st 15, 08:55 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 464
Default Goblin electrification

In article ,
Recliner wrote:
[the goblin]
Are the platforms already long enough for four-car trains?


No. Most stations that used to have longer platforms have had the
length beyond two car closed. This would be easy to fix - repoint
the brickwork, repaint all the things, etc. But South Tottenham
would be more challenging - extending westwards is tricky becuase
there's a bridge over the A10 that way; extending eastwards is
tricky becuae there's a junction that way. Google maps will give
you a picture - literally.

Cheers,
Mike

--
Mike Bristow

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
GOBLIN: FURTHER ELECTRIFICATION WORK. [email protected] London Transport 11 November 27th 17 02:29 PM
Goblin to close for Electrification work Jim Chisholm London Transport 12 February 18th 16 12:53 AM
Goblin electrification [email protected] London Transport 0 October 2nd 15 10:33 AM
Goblin electrification Mark Bestley[_2_] London Transport 0 October 2nd 15 10:16 AM
South Tottenham and GOBLIN electrification TheOneKEA London Transport 34 June 3rd 11 09:01 PM


All times are GMT. The time now is 01:11 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017