Paul Corfield wrote in message . ..
On Mon, 23 Feb 2004 10:35:14 -0000, "Alan Ingham"
wrote:
Thanks Paul. Didn't realise LU staff read this group! I guess I just wanted
to know what the intention was as I'd heard "Ken had spoken" and said the
line was going to stay in its present state.


I think you'll find there are lots of LUL staff on the group - some more
conspicuous than others.

There is an early finish to evening services tomorrow night on the
Northern which is being advertised as related to the re-opening. Not
sure what is involved but I *guess* it will be ultrasonic / computer
assessments of the track and its geometry as installed.


So if nothing else requires modification (WHAM WHAM WHAM) then the
cross-services in TT48 at Camden Town will resume sometime in March or
early April, right? Or will LU test it as thoroughly as possible and
wait until the summertime?

Brad
  #2   Report Post  
Old February 26th 04, 06:21 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 8
Default Northern Line future

It was a dark and stormy night when TheOneKEA
wrote in article . ..
Paul Corfield wrote in message news:b3lk30t6vpd44melprmr
...
On Mon, 23 Feb 2004 10:35:14 -0000, "Alan Ingham"
wrote:
Thanks Paul. Didn't realise LU staff read this group! I guess I just wanted
to know what the intention was as I'd heard "Ken had spoken" and said the
line was going to stay in its present state.


I think you'll find there are lots of LUL staff on the group - some more
conspicuous than others.

There is an early finish to evening services tomorrow night on the
Northern which is being advertised as related to the re-opening. Not
sure what is involved but I *guess* it will be ultrasonic / computer
assessments of the track and its geometry as installed.


So if nothing else requires modification (WHAM WHAM WHAM) then the
cross-services in TT48 at Camden Town will resume sometime in March or
early April, right? Or will LU test it as thoroughly as possible and
wait until the summertime?

Poster at London Bridge last night said "within 2 weeks".

Grebbsy
--
"All vampires suck, but not all who suck are vampires."
(--B.J.Kuehl)

:::Grebbsy :::::::lemon curry?:::
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Design the Piccadilly line station of the future! Tom Anderson London Transport 0 September 25th 06 03:52 PM
Future of CDRs and NR season tickets in TfL zones? Rich Mallard London Transport 130 February 24th 05 09:46 PM
TfL Vision of the Future map Dave Arquati London Transport 102 July 21st 04 10:39 PM
Discussion on the future of commuting 20th May 2004 Martin Earnshaw London Transport 1 April 9th 04 10:21 PM
Future is bleak for Croxley Rail Link JWBA68 London Transport 8 January 28th 04 12:53 PM


All times are GMT. The time now is 03:21 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017