Default By Northern Line to Battersea

On Tue, 29 Dec 2015 12:35:45 +0000, Basil Jet
wrote:

On 2015\12\29 11:51, Recliner wrote:
On Tue, 29 Dec 2015 11:30:51 +0000, Basil Jet
wrote:

On 2015\12\29 10:43, tim..... wrote:

"Basil Jet" wrote in message
...
On 2015\12\28 22:51, Recliner wrote:
wrote:
On Thu, 24 Dec 2015 14:25:15 +0000
Basil Jet wrote:
I notice that "Nine Elms" roundels have gone up all over the hoarding
surrounding the former Sainsburys opposite Wilcox Road.

Boris has also ceremonially started a conveyor belt from the Battersea
station site to the Thames.
https://www.youtube.com/watch?v=gcjSnzw38iI

Maybe they should have just built a two way conveyor from Battersea to
Vauxhall and then we wouldn't need the railway ;-)

I wonder if when that extension is built and the line is
operationally split
in 2 whether one half of the line will be given a new name or
whether it'll
still all be known as the northern line?

The extension is certainly being built and will open in 2020, but the
line
won't be split into two for some years (if at all). The split
requires the
rebuilding of Camden Town station.


So Morden will just lose, what, a third of its peak service?

Morden terminus can't cope with the peak service anyway

some have to be turned at Tooting

So Tooting will just lose, what, a third of its peak service?


As I said, the fleet is to be significantly increased, so that both
branches will get a more frequent service (of course, apart from
during the Bank rebuilding).


But surely increased frequencies are not possible until Camden is a
junction no more.


The new signalling helps.

But eliminating the junction would provide a big increase in capacity,
which is why it remains a long-term aim. In the interim, you can
optimise the use of the junctions, by having fewer conflicting
movements. Note that other lines, such as the Central, also have
branches with junctions.

  #22   Report Post  
Old December 29th 15, 11:43 AM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default By Londons Northern Line to Battersea

On 2015\12\29 12:39, Basil Jet wrote:
On 2015\12\29 11:18, e27002 aurora wrote:
On Tue, 29 Dec 2015 03:00:52 +0000, Basil Jet
wrote:

On 2015\12\28 22:51, Recliner wrote:
wrote:
On Thu, 24 Dec 2015 14:25:15 +0000
Basil Jet wrote:
I notice that "Nine Elms" roundels have gone up all over the hoarding
surrounding the former Sainsburys opposite Wilcox Road.

Boris has also ceremonially started a conveyor belt from the
Battersea
station site to the Thames.
https://www.youtube.com/watch?v=gcjSnzw38iI

Maybe they should have just built a two way conveyor from
Battersea to
Vauxhall and then we wouldn't need the railway ;-)

I wonder if when that extension is built and the line is
operationally split
in 2 whether one half of the line will be given a new name or
whether it'll
still all be known as the northern line?

The extension is certainly being built and will open in 2020, but
the line
won't be split into two for some years (if at all). The split
requires the
rebuilding of Camden Town station.


So Morden will just lose, what, a third of its peak service?


One presumes the trains that currently terminate at Kennington will
proceed onto the new branch.


slaps forehead composes himself I knew that. I was just testing.


Actually, the map on the TfL site says otherwise.
https://tfl.gov.uk/travel-informatio...line-extension

But what you're saying makes more sense than their map.
  #23   Report Post  
Old December 29th 15, 12:42 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default By Northern Line to Battersea

In message , at 12:42:00 on
Tue, 29 Dec 2015, Recliner remarked:

But surely increased frequencies are not possible until Camden is a
junction no more.


The new signalling helps.

But eliminating the junction would provide a big increase in capacity,
which is why it remains a long-term aim. In the interim, you can
optimise the use of the junctions, by having fewer conflicting
movements.


You could get more through trains at Camden by having the "two branches"
permanently separated, with the current track layout - but the issue
then is a big increase in people changing platforms at Camden, and
that's why it wouldn't cope.
--
Roland Perry
  #24   Report Post  
Old December 29th 15, 01:59 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default By Northern Line to Battersea

On Tue, 29 Dec 2015 13:42:13 +0000, Roland Perry
wrote:

In message , at 12:42:00 on
Tue, 29 Dec 2015, Recliner remarked:

But surely increased frequencies are not possible until Camden is a
junction no more.


The new signalling helps.

But eliminating the junction would provide a big increase in capacity,
which is why it remains a long-term aim. In the interim, you can
optimise the use of the junctions, by having fewer conflicting
movements.


You could get more through trains at Camden by having the "two branches"
permanently separated, with the current track layout - but the issue
then is a big increase in people changing platforms at Camden, and
that's why it wouldn't cope.


Yes, that's why you'd have to send some trains from both southern
branches to both northern branches.
  #25   Report Post  
Old December 29th 15, 02:29 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default By Northern Line to Battersea

In article , (Basil Jet)
wrote:

On 2015\12\28 22:51, Recliner wrote:
wrote:
On Thu, 24 Dec 2015 14:25:15 +0000
Basil Jet wrote:
I notice that "Nine Elms" roundels have gone up all over the hoarding
surrounding the former Sainsburys opposite Wilcox Road.

Boris has also ceremonially started a conveyor belt from the Battersea
station site to the Thames.
https://www.youtube.com/watch?v=gcjSnzw38iI

Maybe they should have just built a two way conveyor from Battersea to
Vauxhall and then we wouldn't need the railway ;-)

I wonder if when that extension is built and the line is operationally
split in 2 whether one half of the line will be given a new name or
whether it'll still all be known as the northern line?


The extension is certainly being built and will open in 2020, but the
line won't be split into two for some years (if at all). The split
requires the rebuilding of Camden Town station.


So Morden will just lose, what, a third of its peak service?


Not exactly as I understand it. They will all go via Bank instead of some
going via Charing Cross.

--
Colin Rosenstiel


  #26   Report Post  
Old December 29th 15, 02:54 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default By London Northern Line to Battersea

On 2015\12\29 12:01, Basil Jet wrote:
I'd be happy for the line that links Highgate with the City to be called
the Whittington Line, although there is already a line starting with W.


Alternatively the Stane Street Line, since it follows the Roman road of
that name from Colliers Wood to London Bridge.
  #27   Report Post  
Old December 29th 15, 02:58 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default By Northern Line to Battersea

wrote:
In article , (Basil Jet)
wrote:

On 2015\12\28 22:51, Recliner wrote:
wrote:
On Thu, 24 Dec 2015 14:25:15 +0000
Basil Jet wrote:
I notice that "Nine Elms" roundels have gone up all over the hoarding
surrounding the former Sainsburys opposite Wilcox Road.

Boris has also ceremonially started a conveyor belt from the Battersea
station site to the Thames.
https://www.youtube.com/watch?v=gcjSnzw38iI

Maybe they should have just built a two way conveyor from Battersea to
Vauxhall and then we wouldn't need the railway ;-)

I wonder if when that extension is built and the line is operationally
split in 2 whether one half of the line will be given a new name or
whether it'll still all be known as the northern line?

The extension is certainly being built and will open in 2020, but the
line won't be split into two for some years (if at all). The split
requires the rebuilding of Camden Town station.


So Morden will just lose, what, a third of its peak service?


Not exactly as I understand it. They will all go via Bank instead of some
going via Charing Cross.


That's one way of putting it. The other is that all Charing X trains go to
Battersea, with additional trains running via Bank to Morden. Either way,
there will be more stock, and more trains running.

  #28   Report Post  
Old December 29th 15, 05:09 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default By Northern Line to Battersea

In message , at 14:59:43 on
Tue, 29 Dec 2015, Recliner remarked:
But surely increased frequencies are not possible until Camden is a
junction no more.

The new signalling helps.

But eliminating the junction would provide a big increase in capacity,
which is why it remains a long-term aim. In the interim, you can
optimise the use of the junctions, by having fewer conflicting
movements.


You could get more through trains at Camden by having the "two branches"
permanently separated, with the current track layout - but the issue
then is a big increase in people changing platforms at Camden, and
that's why it wouldn't cope.


Yes, that's why you'd have to send some trains from both southern
branches to both northern branches.


Some trains to both branches??

Split the train at Camden Town and send half each way?
--
Roland Perry
  #29   Report Post  
Old December 29th 15, 07:19 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2013
Posts: 152
Default By Londons Northern Line to Battersea

On Tue, 29 Dec 2015 11:18:24 +0000, e27002 aurora
wrote:

Subject: By Londons Northern Line to Battersea

Why are you changing the subject line? It creates a new thread each
time you do that. It makes a mess.

Original subject was "By Northern Line to Battersea".
--
jhk
  #30   Report Post  
Old December 29th 15, 07:28 PM posted to uk.railway,uk.transport.london,misc.transport.urban-transit
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default By Londons Northern Line to Battersea

Jarle Hammen Knudsen wrote:
On Tue, 29 Dec 2015 11:18:24 +0000, e27002 aurora
wrote:

Subject: By Londons Northern Line to Battersea

Why are you changing the subject line? It creates a new thread each
time you do that. It makes a mess.

Original subject was "By Northern Line to Battersea".


Adrian is obsessed with cross-posting to international news groups, so he
sometimes changes titles in order that the members of those groups know
that these are actually local UK threads that have been parachuted in. It's
also why he justifies using US spellings in purely UK threads.

He's not worried that this annoys others in the original groups, as he
apparently wishes to do so. Given how many people he blocks (or claims to
block), he must have trouble following threads anyway.



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
By London's Northern Line to Battersea [email protected] London Transport 148 February 28th 16 06:50 AM
Battersea Northern Line extension now done with a loan? Someone Somewhere London Transport 68 November 11th 13 08:56 PM
Northern Line to Battersea Power Station 77002 London Transport 11 December 29th 11 09:07 AM
Northern Line Extension To Battersea Paul London Transport 7 May 24th 11 06:36 PM
Northern line to battersea [email protected] London Transport 3 February 23rd 11 12:32 PM


All times are GMT. The time now is 06:24 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017