Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#10
![]() |
|||
|
|||
![]()
On Tue, 16 Feb 2016 09:49:06 +0000
Water musician wrote: On 16 Feb 2016, d wrote (in article ): No, its closed because TfL don't believe in installing reversing points. To close 3 miles of the line that could satisfactorily operated otherwise just because of work at one station is pathetic. Presumably you DO believe in paying a £6 (or might it be a tenner?) single-zone fare to fund lots of enhancements. So lets get this straight, you think installing one extra set of reversing points when the ELLX was being built would require an extra 5 quid on fares to fund it do you? Go and have a lie down. -- Spud |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
A stock after closure of ELL | London Transport | |||
Weekend District/Circle Closure | London Transport | |||
Closure of Liverpool Street this morning | London Transport | |||
Five Day closure of Central Line (was surprised) | London Transport | |||
Success of Central Line Closure answer to Track Maintenance | London Transport |