  #10   Report Post  
Old February 9th 17, 07:26 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Network Rail "incorrectly designed" the Gospel Oak - Barking improvements

In article , d () wrote:

On Thu, 9 Feb 2017 10:17:56 +0000 Roland Perry wrote:
In message
-septe
mber.org, at 09:20:11 on Thu, 9 Feb 2017, Recliner
remarked:


http://www.networkrailmediacentre.co...nd-gospel-oak-
to-baking-route-to-reopen-on-monday-27-february-but-further-work-is-required


http://www.barking-gospeloak.org.uk/...ss_release.pdf

It looks like NR is trying to pass the blame on to the contractors:

"Along the 14-mile route, a number of the structures, which carry the
overhead lines, were incorrectly designed and couldn't be installed at
the planned locations. Late delivery of materials and structures also
led to further delays."

I think NR would have used different words if the faults had been its
own.


NR's fault is (once again) lack of project management and performing
checks on what was being designed/manufactured.


Of course, if they'd simply installed 3rd rail they could have done
it in a couple of months while the line carried on running. But
thanks to stupid DoT rules about no new 3rd rail they've had to close
the line for god knows how long inconveniencing 10s of thousands of
people and spent 100m.


I see our know-nothing Kipper correspondent has just excelled himself with
his ignorance of electrical engineering. Not for nothing has all the third
rail in North London been replaced with 25KV overhead electrification. A
period of self-education would now be in order.

--
Colin Rosenstiel


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Network Rail "incorrectly designed" the Gospel Oak - [email protected] London Transport 1 February 15th 17 11:48 AM
Network Rail "incorrectly designed" the Gospel Oak - [email protected] London Transport 1 February 11th 17 11:14 PM
Gospel Oak-Barking Andrea London Transport 16 March 8th 07 07:37 PM
SPECS installation in Gospel Oak? John Rowland London Transport 1 April 15th 06 09:52 AM
Gospel Oak - Barking Slim London Transport 1 July 21st 04 12:26 PM


All times are GMT. The time now is 12:04 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017