Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
You'd have thought by now that LU would have got its procedures for a signal
failure down to a tee. Instead we get 15 min delays on the jubilee line. Just how hard is it to drive a train on manual through a section with presumably a faulty ATO transmitter? And more to the point why does it cause such delays? -- Spud |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
2009 stock piss poor interior design | London Transport | |||
It's not big, it's not clever - "Source who works for TfL" picks onpoor gullible journalist | London Transport | |||
Why the piccadilly to Heathrow , why not the District? | London Transport | |||
Normal Northern Line service not resuming this week + pictures | London Transport | |||
Not to Do With London Transport | London Transport |